
93
g
The startup test can take anything from just a few seconds up to several minutes de-
pending on national regulations. The time elapsed is indicated by a bar shrinking from
the top down.
Whenever two scale divisions stop flashing and disappear, 1/10 of the total duration
of the test is over.
Operation of
Feeding Energy
into the Grid
-
Once the tests have been completed, the inverter starts feeding power into the grid.
-
The display shows the present power feeding into the grid.
-
The Operating Status LED lights up green, and the inverter starts operating.
Содержание IG Plus 100 V-1
Страница 2: ...0...
Страница 4: ...2...
Страница 10: ...8...
Страница 16: ...14...
Страница 17: ...General Information...
Страница 18: ......
Страница 20: ...18 Safety symbols Risk of serious injury and damage due to incorrect operation...
Страница 24: ...22...
Страница 25: ...Installation and Startup...
Страница 26: ......
Страница 31: ...29 g 16 Strain relief for solar module strings 17 6 DC terminals 18 DC main switch Item Description...
Страница 76: ...74 1 2 6 x 18...
Страница 80: ...78 Closing Fronius IG Plus Closing Fronius IG Plus 1 1 3 2 1 1 2 3 2 4 1 3...
Страница 89: ...Operation...
Страница 90: ......
Страница 106: ...104 Options If the DatCom component for the required options is not available the message N A not available is shown...
Страница 126: ...124...
Страница 127: ...Troubleshooting and Maintenance...
Страница 128: ......
Страница 146: ...144 Disconnect DC wire Disconnect AC wire 8 9...
Страница 150: ...148...
Страница 151: ...Appendix...
Страница 152: ......
Страница 164: ...162...
Страница 165: ...163 g...
Страница 167: ...165 g...