
73
g
1
DC+
DC-
AC
13
DC +
DC -
DC -
DC +
DC
+
1
DC
-
2
DC -
DC +
3
4
14
IMPORTANT!
-
Set the jumper from the 'SM
ON
' position to the 'SM
OFF
' position for correct measure-
ment results
-
Check the polarity and voltage of the DC cables strings: The voltage should be a max.
of 600 V.
SM
ON
SM
OFF
2
1
3
15
16
2
1
3
SM
ON
SM
OFF
17
IMPORTANT!
When using connection distributors, insert 6 metal bolts with fuse covers in
the fuse holders. The metal bolts are included in the Fronius IG Plus scope of delivery.
Содержание IG Plus 100 V-1
Страница 2: ...0...
Страница 4: ...2...
Страница 10: ...8...
Страница 16: ...14...
Страница 17: ...General Information...
Страница 18: ......
Страница 20: ...18 Safety symbols Risk of serious injury and damage due to incorrect operation...
Страница 24: ...22...
Страница 25: ...Installation and Startup...
Страница 26: ......
Страница 31: ...29 g 16 Strain relief for solar module strings 17 6 DC terminals 18 DC main switch Item Description...
Страница 76: ...74 1 2 6 x 18...
Страница 80: ...78 Closing Fronius IG Plus Closing Fronius IG Plus 1 1 3 2 1 1 2 3 2 4 1 3...
Страница 89: ...Operation...
Страница 90: ......
Страница 106: ...104 Options If the DatCom component for the required options is not available the message N A not available is shown...
Страница 126: ...124...
Страница 127: ...Troubleshooting and Maintenance...
Страница 128: ......
Страница 146: ...144 Disconnect DC wire Disconnect AC wire 8 9...
Страница 150: ...148...
Страница 151: ...Appendix...
Страница 152: ......
Страница 164: ...162...
Страница 165: ...163 g...
Страница 167: ...165 g...