Froling FHG Скачать руководство пользователя страница 43

Boiler Maintenance 

 

 

 

Froling GmbH, Industriestraße 12, 4710 Grieskirchen, AUSTRIA 

Page 43 

www.froling.com

 

B0600008_US 

5.2

 

Inspection, cleaning and maintenance 

 

Regular cleaning of the boiler extends product life and is a basic re-

quirement for smooth running. So clean the boiler regularly! 

 

5.2.1

 

Daily Maintenance / Before every firing 

Cleaning of Heat Exchanger pipes 

 

Activate the lever of the heat ex-

changer cleaning system (Efficiency 

Optimization System EOS) several 

times before the heating-up process 

(5-10 times up and down) 

 

 

5.2.2

 

Weekly Maintenance 

Removing the ash 

 

 

Open the Insulation Door and the 

Ignition Door 

 

Using the ash scraper, scrape the 

ash located above the Combustion 

Chamber into the Combustion Cham-

ber 

 

Open the Combustion Chamber 

Door 

 

Remove the ash using the rounded 

ash shovel 

 

Shovel the ash into the container 

intended to receive it 

 

Important! Leave 

½

”-1” of ash on 

the refractory and cast iron surfaces to 

protect them. 

 

Use a Fire-proof container with a   

cover! 

 

Never use a vacuum to remove ash 

from combustion or loading chamber. 

This will drastically shorten the life of 

the combustion stones. 

 

 

 

 

IMPORTANT:  

Ashes removed from the boiler should be placed in a metal container 

with tightly fitting lid. The closed container of ashes should be placed 

on a non-combustible floor or on the ground, well away from all 

combustible materials, pending final disposal. If the ashes are dis-

posed of by burial in soil or otherwise locally dispersed, they should 

be retained in the closed container until all cinders have thoroughly 

cooled. Other waste should not be placed in this container 

 
 

Содержание FHG

Страница 1: ...nch language manual may be obtained from Tarm Biomass by calling 800 782 9927 or by email request to info tarmusa com Operation and Service Manual Wood Fired Central Heating Boiler FHG Read and follow...

Страница 2: ...Update Date May 2014 Reprint date Nov 2014...

Страница 3: ...chapter 2 Units of Measurement Most hardware and fittings on the boiler are metric some plumbing fit tings are British Straight Thread In this manual the convention used for dimensions is that values...

Страница 4: ...iler does not carry an ASME stamp The instructions in this manual and in supporting documentation addi tional instructions diagrams and component information provided by Tarm Biomass must be followed...

Страница 5: ...2 4 Safety devices 20 2 4 1 Devices for Preventing the Boiler from overheating 20 Pressure Relief Valve 20 Overheat Thermostat Safety Temperature Limit Switch STL 21 Gravity Over heat Dump Loop 21 Ove...

Страница 6: ...tem 39 4 6 Menu Boiler 39 4 6 1 Status Displays for the Boiler 39 4 6 2 Temperature settings for the Boiler 39 4 7 Menu System 40 4 7 1 Current values 40 4 7 2 Error 40 4 7 3 Basic Display parameters...

Страница 7: ...wer supply 46 6 2 Excessive temperature 46 6 3 Error messages at Boiler Control System 47 6 3 1 Acknowledging a error message 48 6 3 2 List of possible error message 48 6 4 Misoperation of Door Switch...

Страница 8: ...ontrol System Lambdatronic S 3200 7 1 Large graphical display to show operating modes states of components and parameters 7 2 Status LED operating status green light flashing slowly boiler activated g...

Страница 9: ...3 Heat Exchanger Insulation Cover 14 Heat Exchanger Cover 15 Fuel Loading Chamber 16 Combustion Chamber 17 Flame Slot 18 Smoke Extraction Duct 19 Primary Air Damper Actuator 20 Secondary Air Damper Ac...

Страница 10: ...boiler is tested and listed to applicable UL CAN and other standards The boiler is not ASME stamped The installer should follow local or state installation requirements The FHG wood gasification boile...

Страница 11: ...per sonal injury hazards Obey all safety messages that follow this symbol to avoid possible injury or death DANGER indicates a hazardous situation which if not avoided will result in death or serious...

Страница 12: ...r non permitted fuels will cause serious faults in combustion e g spontaneous combustion of carbonization gases or flash fires Instructions and guidelines for system configuration and minimum operatio...

Страница 13: ...ney must be 6 150 mm diameter listed UL 103 HT or ULC S629 residential all fuel type or tile lined masonry Flue connector pipe must be 6 150 mm diameter made of a minimum 24 MSG black steel Inadequate...

Страница 14: ...aterials Do not use chemicals gasoline oil or any other combustible fluids to start the fire Use of inappropriate fuels can result in Danger of Life or Severe Injury caused by explosive combustion and...

Страница 15: ...leaned regularly to remove accumulated creosote and ash Ensure that the Heat Exchanger Flue Gas Pipe and Chimney are cleaned at the end of heating season to minimize corrosion during the summer months...

Страница 16: ...ed for burning of cord wood only Wood briquettes or manufac tured pure wood logs can also be used as fuel provided they have a min imum cross section of 2 5 sq in 16 cm Manufactured logs should be at...

Страница 17: ...rganic materials and any other inappropriate materials Do not use chemicals or fluids to start the fire 2 2 3 Who may operate the boiler Non permitted use of the boiler by unauthorized persons can cau...

Страница 18: ...ictions and installation inspection in your area If there are no applicable local codes follow ANSI NFPA 211 and CAN CSA B365 Special precautions are required for passing the Chimney through a combust...

Страница 19: ...winter time The heating system must be able to carry all heat produced by the Cen tral Heating Boiler and additional heat source if applicable The whole heating system as well as all heating zones has...

Страница 20: ...es for Preventing the Boiler from overheating The FHG comes with safety systems to prevent the following Pressure in the boiler exceeding 30 psi over pressure Boiler water temperature exceeding 212 F...

Страница 21: ...10 of the boiler s maximum rated output Usually this heating zone is connected to the heating sys tem by a solenoid valve normally closed In case of electrical power failure the valve opens the Gravit...

Страница 22: ...er Control System In case no Emergency Off Switch is installed 1 Open Insulation Door slightly and keep it opened 2 Push DOWN Arrow Key at Boiler Control System to switch off In duced Draft Fan 3 Keep...

Страница 23: ...necessary amount of fuel within boiler area before opening boiler doors For usability and preparation of fire wood pay attention to chapter 2 2 within this manual For details refer to chapter 2 2 1 P...

Страница 24: ...y takes place at the end of operating mode Heating Refer to 3 4 Refueling the boiler For behavior in all other operating modes please refer to 4 1 3 Operating modes 3 1 5 Starting the boiler for the f...

Страница 25: ...d longer than four seconds For details refer to chapter 4 1 2 Graphical Display Turn off the Induced Draft Fan by pressing DOWN arrow key Light up the newspaper Turn on the Induced Draft Fan again by...

Страница 26: ...Do not heat up or recharge the boiler The Thermal Storage System is still too hot to store additional amount of energy 3 2 1 Inspect the burning flame Because opening the Combustion Chamber Door duri...

Страница 27: ...st start automatically you will hear the noise Cautiously open Fuel Loading Chamber Door keeping face away from opening Check the amount of combustion residues within the Filling chamber If level of a...

Страница 28: ...the Fuel Loading Chamber with the desired amount of fuel in accordance to heat demand shown by Thermal Storage System loading status symbol as described above Close Fuel Loading Chamber Door 3 3 3 Ign...

Страница 29: ...s fully finished In case of strong smell of smolder or fume coming out of the Ignition Door close Ignition Door and Insulation Door immediately and follow Caution instructions Explosive Gases at Cauti...

Страница 30: ...ly you will hear the noise Cautiously Open Fuel Loading Chamber Door keeping face away from opening Check the amount of un burnt fuel within the Filling chamber and de cide for refueling in accordance...

Страница 31: ...ation Keys Status LED Navigation Keys The navigation keys are for scrolling in the menu and changing parameter values Key Function for UP arrow Navigation Move up in the menu Parameter change Short ke...

Страница 32: ...rated load To exit this function Use Automatic Program below Long Service operation Function not used Automatic Program Short Automatic On Function not used exit other functions only Long Off Functio...

Страница 33: ...ation for every menu point or parameter The info text is also identified by the frame and the info symbol in the status line Info key for pending error messages If an error message was acknowledged af...

Страница 34: ...texts are also identified by a frame Shows activation of boiler See page 32 Function Keys not used Only shown in the Basic Display shows that the Thermal Storage System circulator is active not used n...

Страница 35: ...mpers are closed to the minimum opening If the temperature falls below the set point of boiler temperature the Boiler Control System returns to Heating mode Do not open Boiler Doors Do not refill fuel...

Страница 36: ...in parameters are only visible at specific User Levels To change to another level it is necessary to enter the relevant user code Child lock User Code 0 At Child lock level only the Basic Display is s...

Страница 37: ...er The following parameters however can should be set as desired by the Owner Desired target boiler temperature All temperature values at Boiler Control System are displayed in Centigrade or C only Te...

Страница 38: ...age System Storage tank 01 08 Display Description Storage tank top temperature 55 C Current temperature at Thermal Storage System top sensor Storage tank bottom temperature 50 C Current temperature at...

Страница 39: ...um value for heating circuit release for combination with a Thermal Storage System 4 6 Menu Boiler 4 6 1 Status Displays for the Boiler Display Description Boiler temperature 80 C Actual state values...

Страница 40: ...tware version Version 50 04 Build 04 12 4 7 2 Error See 6 3 Error messages at Boiler Control System 4 7 3 Basic Display parameters Basic Display Description Position 1 Position 2 The display of the tw...

Страница 41: ...ate and Time are used for display purposes only Format of Calendar Date Weekday 2 letters Day 2 digits Month 2 digits Year 2 digits e g MO 07 07 08 Monday 07th of July 2008 Format of Time Hour 2 digit...

Страница 42: ...f is displayed at the Boiler Control Sys tem Wait at least another hour for the boiler to cool down before starting any maintenance work Always wear protective gloves Always use control handles for op...

Страница 43: ...the Combustion Cham ber Open the Combustion Chamber Door Remove the ash using the rounded ash shovel Shovel the ash into the container intended to receive it Important Leave 1 of ash on the refractory...

Страница 44: ...deposits under the grate to ensure trouble free flow of secondary air Important After cleaning under the grates add 1 of ash on top of refractory and cast iron surfaces to protect them 5 2 4 Annual Ma...

Страница 45: ...uel Loading Chamber Door Clean the Smoke Extraction Duct with a small brush Combustion gases are sucked out when the Insulation Door is opened Take care not to push the brush into the Induction fan Ch...

Страница 46: ...er fail restart One hour after power has returned check system for normal operation and compare manometer reading to initial settings If system pressure is below replenish water to the heating system...

Страница 47: ...l continue to run usually When an error is detected The status LED 1 flashes red The error number and the relevant message text are shown in the graphic display The Error symbol is also displayed in t...

Страница 48: ...6 2 Excessive temperature Check switches for heating or circu lators pumps outside Boiler Con trol System Check circulator pump Reopen slide valves or cut offs check flow check valves or zone valves...

Страница 49: ...EMERGENCY OFF switch was activat ed Emergency Off Switch was activat ed In case no Emergency Off Switch is installed connection plugs shall be looped Follow emergency procedure In the event of runaway...

Страница 50: ...ction of the EEPROM memory does not work Ask your boiler dealer to check boiler control core module hard failure 71 009 EEPROM Write error Read or write function of the EEPROM memory does not work Ask...

Страница 51: ...ginal purchaser toward the cost of repair of the warranted item or if Tarm Biomass and the original purchaser agree use the resultant sum as a partial allowance toward Tarm Biomass replacement of the...

Страница 52: ...rty shall be entitled to recover all reasonable expenses it incurs in the action including its reasonable attorneys fees from the nonprevailing party TARM USA S LIMITED WARRANTY EXPRESSLY EXCLUDES COV...

Страница 53: ...6 86 186 8 150 302 235 455 54 129 2 88 190 4 155 311 240 464 56 132 8 90 194 160 320 245 473 58 136 4 92 197 6 165 329 250 482 60 140 94 201 2 170 338 255 491 62 143 6 96 204 8 175 347 260 500 64 147...

Страница 54: ...stra e 12 A 4710 Grieskirchen AUSTRIA PHONE 0043 0 7248 606 0 E MAIL info froling com INTERNET www froeling com 7 4 Importer Tarm Biomass 4 Britton Lane P O Box 285 Lyme NH 03768 PHONE 800 782 9927 E...

Отзывы: