57
PB
INSTALLATION
Installation of the Outdoor Unit
Install the Outdoor Support
1. Select installation location according to the house structure.
2. Fix the support of outdoor unit on the selected location with expansion screws.
Notes
1. Take sufficient protective measures when installing the outdoor unit.
2. Make sure the support can withstand at least four times the unit weight.
3. The outdoor unit should be installed at least 1 1/6inch above the floor in order to install drain joint.(As show in
Fig.18)
Drain hose
Chassis
Outdoor drain joint
Drain vent
Fig.18
Fig.19
At least 1 1/6 inch
above the floor
Foot holes
Foot holes
Fig.20
Fig.21
Screw
Cable Cross
Plate Sub-assy
Valve Cover
Install Drain Joint ( For Colling and Heating Unit Only)
1. Connect the outdoor drain joint into the hole on the chassis.
2. Connect the drain hose into the drain vent. (As show in Fig.19)
Fix the Outdoor Unit
1. Place the outdoor unit on the support.
2. Fix the foot holes of outdoor unit with bolts.(As show in Fig.20)
Connect Indoor and Outdoor Pipes
1. Remove the screw on the right cable cross plate sub-assy and valve cover of outdoor unit and then remove the
cable cross plate sub-assy and valve cover.(As show in Fig.21)
2. Remove the screw cap of valve and aim the pipe joint at the bellmouth of pipe.(As show in Fig.22)
3. Pretightening the union nut with hand.
4. Tighten the union nut with torque wrench .
Refer to the following table for wrench moment of force
gas pipe
Liquid pipe
Liquid
valve
gas valve
Union nut
Pipe joint
Fig.22
Hex nut diameter(inch)
Tightening torque(ft∙Ibf)
Φ1/4
11~14.7
Φ3/8
22.8~29.5
Φ1/2
33.2~40.6
Φ5/8
44.3~47.9
Φ3/4
51.6~55.3
Содержание MRM09Y1J
Страница 8: ...8 INTRODUCTION MWM09Y1J MWM12Y1J Figure 101 Indoor Units MWM18Y3J MWM24Y3J MWM36Y3J...
Страница 37: ...37 OPERATION 18 24kSequenceofOperation...
Страница 38: ...38 OPERATION 18 24k Sequence of Operation O o 0 C L A B C D 1 1 4...
Страница 39: ...39 OPERATION 18 24k Sequence of Operation...
Страница 40: ...40 OPERATION 18 24k Sequence of Operation...
Страница 41: ...41 OPERATION 18 24k Sequence of Operation...
Страница 47: ...47 INSTALLATION...
Страница 48: ...48 INSTALLATION Installation Tools...
Страница 95: ...95 TROUBLESHOOTING Malfunction of IDU Fan Motor U8 Service Manual No Start End...
Страница 113: ...113 WIRING DIAGRAMS Figure 804 36K Indoor Unit Wiring Diagrams Figure 803 24K Indoor Unit Wiring Diagram 6361000043101...
Страница 116: ...116 FIgure 901 PARTS CATALOG Indoor Unit MWM09Y1J MWM12Y1J MWM09Y1J MWM12Y1J...
Страница 118: ...118 FIgure 902 PARTS CATALOG Indoor Unit MWM18Y3J MWM24Y3J...
Страница 123: ...123 FIgure 904 PARTS CATALOG Outdoor Unit MRM09Y1J MRM12Y1J MRM09Y1J MRM12Y1J...
Страница 126: ...126 PARTS CATALOG Outdoor Unit MRM18Y3J FIgure 905...
Страница 128: ...128 PARTS CATALOG Outdoor Unit MRM24Y3J FIgure 906...
Страница 130: ...130 PARTS CATALOG Outdoor Unit MRMY36J FIgure 907 2 9 10 18 20 21 11 12 14 15 22 23 26 27 32 34 4 1...