COMPRESSOR HYDRAULIC SYSTEM

The compressor hydraulic system moves the movable slide
valve (MSV) to load and unload the compressor. It also moves
the movable slide stop (MSS) to increase or decrease the
compressor’s volume ratio (Vi).

The hydraulic cylinder located at the inlet end of the TDS
compressor serves a dual purpose. It is separated by a fixed
bulkhead into two sections. The movable slide valve (MSV)
section is to the left of the bulkhead and the movable slide
stop (MSS) to the right. Both sections are considered double
acting hydraulic cylinders as oil pressure moves the pistons
in either direction.

Both sections are controlled by double-acting, four-way so-
lenoid valves which are actuated when a signal from the
appropriate microprocessor output energizes the solenoid
valve.

Compressor Loading: The compressor loads when MSV
solenoid YY2 is energized and oil flows from the oil manifold
through valve ports P and B to cylinder port SC-2 and enters
the load side of the cylinder. Simultaneously, oil contained in
the unload side of the cylinder flows out cylinder port SC-1
through valve ports A and T to compressor closed thread
port.

Compressor Unloading: The compressor unloads when
MSV solenoid YY1 is energized and oil flows from the oil
manifold through valve ports P and A to cylinder port SC-1
and enters the unload side of the cylinder. Simultaneously,
oil contained in the load side of the cylinder flows out com-
pressor port SC-2 through valve ports B and T to compressor
closed thread port.

Figure 19

NOTE: High Stage Operation: An alternative piping ar-
rangement has been provided to increase slide valve
response time during high stage operation.

Higher operating pressures will slow the compressor unload-
ing response time. Unloading response time can be increased
by closing valve 1 (oil manifold pressure) and opening valve
2 to compressor suction pressure. See Figures 19 and 20.
NEVER OPEN VALVE 1 

AND VALVE 2 AT THE SAME TIME

DURING COMPRESSOR OPERATION.

VOLUMIZER® VOLUME RATIO CONTROL

Vi Increase

Models 60 through 480: The volume ratio Vi is increased
when MSS solenoid YY3 is energized and oil flows from the
oil manifold through valve ports P and A to cylinder port SC-3
and enters the increase side of the cylinder. Simultaneously,
oil contained in the decrease side of the cylinder flows out
cylinder port SC-4 through valve ports B and T to compres-
sor closed thread port.

Vi Decrease

Models 60 through 480: The volume ratio Vi is decreased
when MSS solenoid YY4 is energized and oil flows from the
oil manifold through valve ports P and B to cylinder port SC-4
and enters the decrease side of the cylinder. Simultaneous-
ly, oil contained in the increase side of the cylinder flows out
cylinder port SC-3 through valve ports A and T to compres-
sor closed thread port.

MSV and MSS HYDRAULIC CYLINDER and SOLENOID VALVES

MODELS 60 – 480

Содержание RWB II 480

Страница 1: ...ANUAL CONTAINS RIGGING ASSEMBLY START UP AND MAINTENANCE INSTRUCTIONS READ THOROUGHLY BEFORE BEGINNING INSTALLATION FAILURE TO FOLLOW THESE IN STRUCTIONS COULD RESULT IN DAMAGE OR IMPROPER OPERA TION...

Страница 2: ...in death or serious injury Indicates a potentially hazardous situation or practice which if not avoided will result in death or serious injury SAFETY PRECAUTION DEFINITIONS Indicates a potentially ha...

Страница 3: ...r slugging protection that load surges are known and provisions made for control operat ing cycles and defrosting periods are reasonable and that high side condensers are sized within system and compr...

Страница 4: ...r package When installing on the upper floors of buildings extra pre cautions should be taken to prevent normal package vibra tion from being transferred to the building structure It may be necessary...

Страница 5: ...the shaft by tightening the clamp screws Torque is transmitted from the motor through the elas tomeric gear which floats freely between the hubs Install as follows 1 Slide one hub onto each shaft as...

Страница 6: ...HE SAME OR DER Mark the adjoining bolt holes of each part the two hubs the two disc packs and the center spool so they are put back together in the same position 2 Mount the coupling hubs on their res...

Страница 7: ...arings it is necessary to secure the two cou pling hubs with a bolt to prevent them from drifting apart when rotating 2 Rotate both coupling hubs several revolutions until they seek their normal axial...

Страница 8: ...salignment is within specified tolerance 10 Check parallel lateral misalignment by positioning dial indicator so the stem is in contact with the rim of the com pressor hub at 3 o clock as shown in Fig...

Страница 9: ...turers or types Mixing of oils may cause excessive oil foaming nuisance oil level cutouts oil pressure loss gas or oil leakage and catastrophic compressor failure Use of oils other than Frick Oil in F...

Страница 10: ...refrigerant to boil and vaporize The vapor rises in the return line The density of the refrigerant liquid vapor mixture in the return line is considerably less than the density of the liquid in the s...

Страница 11: ...upply of high pres sure liquid refrigerant be provided to the injection system at all times Two items of EXTREME IMPORTANCE are the design of the receiver liquid injection supply and the size of the l...

Страница 12: ...r volume quanti ty of refrigerant required for 5 minutes of liquid injection oil cooling are given in the following table LIQUID LINE SIZE and RECEIVER VOLUME LINE SIZE POUND LIQUID RWB II SCH 80 OD P...

Страница 13: ...2 HIGH PRESSURE LIQUID INTERMEDIATE PRESSURE GAS TO COMPRESSOR SUCTION STR VCK SUBCOOLED HIGH PRESSURE LIQUID TO EVAPORATOR ECONOMIZER COOLER WIRING ECON2 HV 2 HIGH PRESSURE LIQUID INTERMEDIATE PRESS...

Страница 14: ...rter Wiring Diagram Figure 15 All Frick motor starter pack ages have the timer relay as standard Motor starter and interlock wiring requirements are shown in the Starter Wiring Diagram All of the equi...

Страница 15: ...5 300 5 300 5 100 5 50 5 250 800 5 800 5 500 5 400 5 300 5 100 5 50 5 300 1000 5 1000 5 600 5 500 5 400 5 100 5 50 5 350 1000 5 800 5 500 5 500 5 100 5 100 5 400 800 5 600 5 500 5 200 5 100 5 450 1000...

Страница 16: ...pressure for increased seal life 10 Oil injected into the rotors to maintain good volumetric and adiabatic efficiency even at very high compression ra tios 11 Shaft rotation clockwise facing compresso...

Страница 17: ...n S90 010 O COLD START VALVE DEMAND PUMP OIL SYSTEM This system is designed to provide adequate compressor lubrication for some high stage applications that operate with low differential pressure acro...

Страница 18: ...inder port SC 1 and enters the unload side of the cylinder Simultaneously oil contained in the load side of the cylinder flows out com pressor port SC 2 through valve ports B andT to compressor closed...

Страница 19: ...NJECTION The dual port liquid injection system is designed to obtain the most efficient compressor performance at high and low compression ratios by permitting injection of liquid refriger ant into on...

Страница 20: ...leakage into the system during shut down However on high stage or booster systems with check valve HV 2 can remain open HV 2 also should be closed on systems that utilize autocycle to restart the comp...

Страница 21: ...gnment and adjust as necessary NORMAL START UP PROCEDURE 1 Confirm system conditions permit starting the compressor 2 Press the RUN key 3 Allow the compressor to start up and stabilize Press the AUTO...

Страница 22: ...cable Re move tags 3 Close disconnect switches for compressor motor and oil pump starters 4 Turn off oil heater circuit breaker 5 Perform checkpoints on prestart check list then start unit GENERAL MAI...

Страница 23: ...disconnect switches for compressor and oil pump motor starters If dual oil filters are installed open the outlet then inlet ser vice valves of the standby filter Open inlet service valve slowly to pr...

Страница 24: ...er filter element and 2 O rings Discard filter elements 5 Install new coalescer filter element s Seat element in center of locating tabs on separator bulk head 6 Replace coalescer filter retainer and...

Страница 25: ...RBON GRAPHITE BUSHINGS fFigure 22 Thrust Bearing assembly GG HJ HL Figure 23 Thrust Bearing assembly AS AK AL 5 Insert a brass bar or piece of hardwood in the port open ing and between rotor teeth to...

Страница 26: ...ousing bore Make sure both are free from dirt and grit Coat outer diameter of seal seat and inner diameter of seal housing bore with refrigera tion oil 3 Start seal seat in seal housing bore If force...

Страница 27: ...ize pumps and 0 005 for AS AK and AL size pumps Pump Distance in on O D End Clearance Size of Bearing Housing in GG 7 16 003 HJ HL 9 16 003 AS AK AL 1 2 003 INSTALLATION OF CARBON GRAPHITE BUSHINGS Wh...

Страница 28: ...ck alignment d May have a bent shaft or rotor tooth Straighten or replace e May be a foreign object trying to get into the pump through the suction port 4 Pump not up to capacity a Starving or cavitat...

Страница 29: ...NTENANCE PROGRAM In order to obtain maximum compressor unit performance and ensure reliable operation a regular maintenance pro gram should be followed The compressor unit should be checked daily for...

Страница 30: ...se responsible for its maintenance and servicing Continual recording of gauge pressures tempera tures and other pertinent information enables the observer and serviceman to be constantly familiar with...

Страница 31: ...ssively high suction superheat 4 Excessively high discharge pressure 5 Inadequate refrigerant charge or low receiver level 6 Excessively high or low temperature coolant to the oil cooler 7 Liquid retu...

Страница 32: ...ler 5 Disconnect transducer leads by loosening the terminal screws for the transducer to be changed 6 Tape a 3 ft length of pull wire to the leads of the transdu cer to be removed Below 0 PSIG measure...

Страница 33: ...next step Adjustment of POT 2 and POT 1 are interactive and POT 1 may require adjustment to allow POT 2 to come into range Now completely increase the slide stop The display at this time should indica...

Страница 34: ...front of the sepa rator near the bottom center See Figure 30 The linear transmitter with hermetic enclosure is based on the capacitive measuring principle It features removable elec tronics from the...

Страница 35: ...Frick Factor or Frick for assistance NOTE Troubleshooting the compressor is limited to identifying the probable cause If a mechanical problem is suspected contact the Frick Service Department DO NOT A...

Страница 36: ...OAD Dirt inside solenoid valve preventing valve from operating both ways clean Solenoid may be mechanically actuated by inserting a piece of 3 16 rod against armature pin and pushing spool to opposite...

Страница 37: ...roblem Thermal valve power head lost charge replace Liquid strainer blocked clean Liquid solenoid coil failed replace Excessive load Thermovalve undersized Reduce load or install larger thermovalve LO...

Страница 38: ...RENTIAL ALARM OIL PRESSURE FLUCTUATES Liquid injection overfeeding or refrigerant flood back from system Make necessary adjustments or corrections NOISE and VIBRATION Pump strainer blocked Clean Liqui...

Страница 39: ...achieved by increasing or decreasing discharge tube size NOTE DO NOT ATTEMPT TO ADJUST SUPERHEAT ADJUSTMENT STEM ON BOTTOM OF VALVE IN AN EF FORTTO CHANGETHEVALVE S PERFORMANCE THIS ADJUSTMENT IS PRE...

Страница 40: ...seems to be a total ab sence of oil cooling you will need to check the action of the valve To check the action you will need to remove the cap flange and disc guide If the hole in the valve plate is...

Страница 41: ...closed the oil pressure should be 1 1 times suction pressure 15 psi Differential pressure is defined as de fined as discharge pressure minus suction pressure The shutdown should occur if the conditio...

Страница 42: ...RWB II ROTARY SCREW COMPRESSOR UNITS MAINTENANCE S70 200 IOM Page 42 P I DIAGRAM...

Страница 43: ...RESSURE SAFETY VALVE SP SUCTION PRESSURE STR STRAINER TAH HIGH TEMPERATURE ALARM TAHH HIGH TEMPERATURE SHUTDOWN TAL LOW OIL TEMPERATURE ALARM TALL LOW OIL TEMPERATURE SHUTDOWN TC TEMPERATURE CONTROLLE...

Страница 44: ...RWB II ROTARY SCREW COMPRESSOR UNITS MAINTENANCE S70 200 IOM Page 44 P I DIAGRAM LIQUID INJECTION SINGLE PORT P I DIAGRAM LIQUID INJECTION DUAL PORT...

Страница 45: ...RWB II ROTARY SCREW COMPRESSOR UNITS MAINTENANCE S70 200 IOM Page 45 P I DIAGRAM LIQUID INJECTION BOOSTER...

Страница 46: ...be used in conjunction with the NEC code WIRE SIZING Size supply wires one size larger than required for am perage draw to reduce instantaneous voltage dips caused by large loads such as heaters and c...

Страница 47: ...the same conduit with 120 volt wires Fig ure 42 Never run any wires through an electronic control panel that do not relate to the function of the panel Electronic control panels should never be used...

Страница 48: ...estroy the electronics If the electronic control panel has a starter built into the same panel be sure to run the higher voltage wires where indicated by the manufacturer EMI from the wires can in ter...

Страница 49: ...RWB II PLUS ROTARY SCREW COMPRESSOR UNITS FORMS S70 200 IOM Page 49 OPERATING LOG SHEET...

Страница 50: ...ontrol wiring is run in a separate conduit from oil pump and compressor motor wiring __ Confirm no high voltage wiring enters the micro panel at any point __ Check current transformer for correct sizi...

Страница 51: ...rd 1 Serial _____________ Rev _____ U13 Analog Ver _________ and Date ______________ Analog Board 2 Serial _____________ Rev _____ U13 Analog Ver _________ and Date ______________ Compressor Motor Inf...

Страница 52: ...nment Ambient Temperature at Time of Alignment _______ Oil Separator Temperature at Time of Alignment ________ Motor Coupling Type ___________ Size ___________ Distance Between Coupling Hub Faces ____...

Страница 53: ...____________________ Installing Contractor _____________________________ Address ______________________________________ Service Technician ______________________________ Equipment ID As in Microlog __...

Страница 54: ...333Q0001326 Relay 3PDT 115V 1 ALL 333Q0000206 UNIT Temperature Probe TE 1 4 1 ALL 640A0035H01 Transducer Pressure 0 200 PSIA PE 4 Quantum only 1 ALL 111Q0280887 Transducer Pressure 0 500 PSIA PE 1 3 Q...

Страница 55: ...RWB II ROTARY SCREW COMPRESSOR UNITS NOTES S70 200 IOM Page 55...

Страница 56: ...Q NET can be applied to both new and existing systems Q NET means precise control 24 hours a day seven days a week Q NET distributed architecture means faster easier economical installations Q NET del...

Отзывы: