background image

070.750-IOM2 (JAN 21)

Page 13

HPS 273 ROTARY SCREW COMPRESSOR

OPERATION

Operation

Initial start-up 

Before the start-up, complete the prestart check. See the 

Forms

 

section for the 

Prestart checklist

.

Initial start-up procedure 

After performing the prestart check, the compressor unit 
is ready for start-up. In low ambient conditions, have oil 
heaters and heating wires on for 24 h before start-up. It is 
important that an adequate gas load be available to load 
test the unit at normal operating conditions. Keep the fol-
lowing points in mind during initial start-up: 

1.   For proper and safe operation, run the compressor at 

the proper speed and discharge pressure. At any speed, 
exceeding design conditions creates a potential hazard. 

2.   Immediately after start-up, adjust the oil cooling 

system. After 1 h to 3 h, adjust it again after operating 
conditions are within expected parameters.

3.   Pull and clean suction strainer after 24 h of operation. 

If it is excessively dirty, repeat every 24 h until the 
system is clean. Otherwise, follow the normal mainte-
nance schedule. 

4.   Perform vibration analysis if preventive maintenance is 

required. If performing a vibration analysis, it is neces-
sary to establish a baseline when the system is running 
at normal conditions.

Normal start-up procedure 

1. 

 Confirm system conditions permit starting the com

-

pressor.

Notice

Ambient temperatures need to be high enough to 
prevent excessive condensing; otherwise, initiate oil 
heaters and heat tracing 24 h before start-up.

 

2.  Start the unit. 
3.   Observe the compressor unit for mechanical tight-

ness of the external piping, bolts, and valves. Ensure 
that the machine has no oil and vapor leaks. If any of 
these occur, shut down the compressor and correct the 
problem as necessary using good safety precautions. 

Control system

The HPS compressor and package requires a dedicated 
control system, either Quantum or UNISAB. For details on 
operation of these control systems, refer to the respective 
IOM manuals.

Operation and start-up instructions 

The Frick HPS 273 Rotary Screw Compressor is a com-
ponent in an integrated system. As such, the compressor 

operation requires some specific conditions to ensure 

trouble-free running.

The information in this section provides logical step by 
step instructions to properly start up and operate the HPS 
Rotary Screw Compressor in your unit. Only matters which 

may influence the proper operation of the Frick HPS 273 

compressor are included.

Note:

 You must read the following subsections and ensure 

you understand the information before attempting 

to start or operate the unit.

Low ambient operation 

 

Warning

Everything must be heat traced and insulated, even the 
compressor.

Insulate the package oil separators, the oil piping, and the 

oil filter as a minimum requirement. This can preserve the 

heat generated by the oil heaters, prevent condensation, 
and secure lubrication at start-up.

Always insulate the oil separator for heat pump and fuel 
gas compression applications. It is often necessary to 
insulate the complete suction line for heat pumps in order 
to prevent condensation and possible slugging. In these 
cases, heating wires are necessary.

With an automated valve, regulate oil flow to the main 

oil port being used (SM-2 or SM-1) in order to continu-
ously achieve the highest possible discharge temperature 
needed.

Содержание HPS 2709

Страница 1: ...ese instructions may result in personal injury or death damage to the unit or improper operation Rotary Screw Compressor HPS 2709 2712 Check www FrickCold com for the latest version of this publicatio...

Страница 2: ...e 9 Rigging and handling 9 Foundation 9 Customer connections 10 Vi and effective orifice sizes 10 Compressor oil 10 Oil pump 11 Motor mounting foot mounted only 11 Compressor Motor coupling requiremen...

Страница 3: ...ting cycles and stand still periods are reasonable Size high side components within system and com pressor design limits HPS compressors have small clearances and the compres sor package and system mu...

Страница 4: ...15 Z Plant Decade Month Year Global Seq no Additional Remarks 1024 0 A 9 0000015 Z Month A JAN B FEB C MAR D APR E MAY F JUN G JUL H AUG K SEP L OCT M NOV N DEC Additional Remarks R Remanufactured R1...

Страница 5: ...ith dry nitrogen and bring pressure to 0 psig 4 Pump oil into the SM1 Use break in oil P N 111Q0831809 for storage purposes The amount of oil necessary for HPS 273 compressors is 25 gal 5 After the co...

Страница 6: ...the internal volume ratio to match the system pressure ratio Control of the internal volume ratio eliminates the power penalty associated with over or under compression Vol ume ratio control is achiev...

Страница 7: ...tor deflection and unwanted contact with the rotor housing For this reason proper calibration of the slide valve and slide stop is essential Note For 1 3 to 1 96 and 1 7 to 3 0 Vi range machines the m...

Страница 8: ...070 750 IOM2 JAN 21 Page 8 HPS 273 ROTARY SCREW COMPRESSOR INSTALLATION OPERATION MAINTENANCE This page is intentionally left blank...

Страница 9: ...from the compressor See Table 5 for allowable flange loads HPS 273 compressors are designed to be driven with an open drive foot mounted motor The rotor and bear ing design set limitations must not b...

Страница 10: ...si with a new oil filter element This is critical for the proper operation of the balance piston which is used to ensure the life of the male and female axial bearing If the speed turndown is more tha...

Страница 11: ...is essential to properly align the coupling to ensure proper bearing and seal perfor mance 1 Select and install the coupling so that it does not trans mit any axial load to the compressor shaft 2 Set...

Страница 12: ...Johnson Controls Frick for additional information for natural gas compression The main oil injection line that connectd to port SM 1 or SM 2 must have a regulating valve to permit adjustment of the o...

Страница 13: ...ht ness of the external piping bolts and valves Ensure that the machine has no oil and vapor leaks If any of these occur shut down the compressor and correct the problem as necessary using good safety...

Страница 14: ...070 750 IOM2 JAN 21 Page 14 HPS 273 ROTARY SCREW COMPRESSOR OPERATION This page is intentionally left blank...

Страница 15: ...odic vibration analysis can be useful in detecting bearing wear and other mechanical failures General information This section provides instructions for normal maintenance a maintenance program and tr...

Страница 16: ...n Check sensor calibration n n n n n n n n n n n n n n n n n n n n n Check BPR function n n n n n n n n n n n n n n n n n n n n n n Test high pressure cut out Test annually Vibration analysis Every 6...

Страница 17: ...it is possible that two relatively obvious problems combine to provide a set of symptoms that can mislead the troubleshooter Be aware of this possibility and avoid solving the wrong problem Warning Av...

Страница 18: ...pling from the motor shaft 4 While supporting the motor and compressor assembly with a crane remove the bolts at the motor feet and then at the compressor feet 5 Thoroughly clean the compressor and mo...

Страница 19: ...pump and check oil pump motor rotation o Leave micro energized to ensure oil heaters are on and oil temperature is correct for start up Do not energize compressor drive motor Only authorized factory f...

Страница 20: ...enter Checked Marked N A Compressor Coupling Hub Runout____________ Motor Coupling Hub Runout_____________ Initial cold alignment Initial hot alignment Final hot alignment Operating log sheet Date Tim...

Страница 21: ..._______ Frame Size __________ H P _________ Refrigerant Ambient Room Temperature _________ F Operating Conditions Vibration data sheet Suction Discharge Oil Separator Slide valve position Press Press...

Страница 22: ...ion high Vi 1 5 8 12UN 2B SM 2 Main oil injection low Vi 1 5 8 12UN 2B SV 1 Class 600 ANSI round flange 1 1 4 Flange T Manifold block tank 1 1 16 12UN 2B Figure 7 Compressor port locations HPS 2709 27...

Страница 23: ...g rings 9 long term storage 5 M maintenance 15 maintenance schedule 16 misalignment 11 mixing valve 12 moisture 5 moisture contamination 15 motor 20 motor mount 7 motor shaft 18 N natural gas 12 nitro...

Страница 24: ...7 Updated Shaft seal section removed last sentence Page 9 Added callout table for Figure Page 10 Updated port information on Customer connections section Added callout table for Figure Page 16 Updated...

Отзывы: