Frick HPS 2709 Скачать руководство пользователя страница 2

070.750-IOM2 (JAN 21)

Page 2

HPS 273 ROTARY SCREW COMPRESSOR

INSTALLATION - OPERATION - MAINTENANCE

Indicates an imminently hazardous situation that, if not avoided, results in death or serious injury.

Indicates a potentially hazardous situation or practice that, if not avoided, results in death or 

serious injury.

Safety precaution definitions

Indicates a potentially hazardous situation or practice that, if not avoided, results in damage to 

equipment or minor injury.

Indicates an operating procedure, practice, or portion thereof, which is essential to highlight.

Contents

General information

Preface  ............................................................................. 3
Design limitations  ............................................................. 3
Job inspection  .................................................................. 3
Standard bare compressor  ............................................... 3
Transit damage claims  ...................................................... 3

Compressor identification 

 ................................................ 3

Long-term storage ............................................................ 5

Preparing the compressor for storage .......................... 5
Maintaining the compressor in storage ........................ 5

Description ........................................................................ 5

HPS 273 compressor  ................................................... 5
Compressor lubrication system  ................................... 6
Oil pump (optional) ....................................................... 6

Construction details .......................................................... 6

Design limits ................................................................. 7

Vibration and sound data .................................................. 7

Installation

Outline dimensions ........................................................... 9
Holding charge and storage .............................................. 9
Rigging and handling ......................................................... 9
Foundation ........................................................................ 9
Customer connections .................................................... 10

Vi and effective orifice sizes

 ....................................... 10

Compressor oil ................................................................ 10
Oil pump ......................................................................... 11
Motor mounting (foot-mounted only) ............................. 11

Compressor/Motor coupling requirements ................. 11
Coupling alignment requirements 
(foot-mounted only) ................................................... 11

Oil heaters - Heating wires and insulation  ..................... 12

Oil filters

 ......................................................................... 12

Oil cooling requirements ................................................. 12
Dehydration/evacuation test ........................................... 12
Electrical installation ....................................................... 12

Operation

Operation and start-up instructions  ............................... 13
Low ambient operation  .................................................. 13
Initial start-up  ................................................................ 13

Initial start-up procedure  .......................................... 13
Normal start-up procedure  ........................................ 13

Control system ................................................................ 13

Maintenance

General information  ....................................................... 15
Normal maintenance operations  .................................... 15
General maintenance  ..................................................... 15
Changing oil .................................................................... 15

Maintenance program  ............................................... 15

Maintenance schedule ..................................................... 16

Vibration analysis  ...................................................... 17
Oil quality and analysis  .............................................. 17
Operating log  ............................................................ 17

Troubleshooting guide  .................................................... 17
Abnormal operation analysis and correction  .................. 17
Troubleshooting the HPS 273 compressor ...................... 18

Replacing a bare compressor  .................................... 18
Shutdown due to improper oil pressure  
(high stage and booster)  ........................................... 18

Forms

Compressor prestart checklist ......................................... 19
Alignment log for electric motor driver ........................... 20
Drive train alignment ....................................................... 20
Operating log sheet ........................................................ 20
Vibration data sheet ........................................................ 21
Compressor port locations .............................................. 22

 Warning
 

 

Caution

  

Danger

Notice

Содержание HPS 2709

Страница 1: ...ese instructions may result in personal injury or death damage to the unit or improper operation Rotary Screw Compressor HPS 2709 2712 Check www FrickCold com for the latest version of this publicatio...

Страница 2: ...e 9 Rigging and handling 9 Foundation 9 Customer connections 10 Vi and effective orifice sizes 10 Compressor oil 10 Oil pump 11 Motor mounting foot mounted only 11 Compressor Motor coupling requiremen...

Страница 3: ...ting cycles and stand still periods are reasonable Size high side components within system and com pressor design limits HPS compressors have small clearances and the compres sor package and system mu...

Страница 4: ...15 Z Plant Decade Month Year Global Seq no Additional Remarks 1024 0 A 9 0000015 Z Month A JAN B FEB C MAR D APR E MAY F JUN G JUL H AUG K SEP L OCT M NOV N DEC Additional Remarks R Remanufactured R1...

Страница 5: ...ith dry nitrogen and bring pressure to 0 psig 4 Pump oil into the SM1 Use break in oil P N 111Q0831809 for storage purposes The amount of oil necessary for HPS 273 compressors is 25 gal 5 After the co...

Страница 6: ...the internal volume ratio to match the system pressure ratio Control of the internal volume ratio eliminates the power penalty associated with over or under compression Vol ume ratio control is achiev...

Страница 7: ...tor deflection and unwanted contact with the rotor housing For this reason proper calibration of the slide valve and slide stop is essential Note For 1 3 to 1 96 and 1 7 to 3 0 Vi range machines the m...

Страница 8: ...070 750 IOM2 JAN 21 Page 8 HPS 273 ROTARY SCREW COMPRESSOR INSTALLATION OPERATION MAINTENANCE This page is intentionally left blank...

Страница 9: ...from the compressor See Table 5 for allowable flange loads HPS 273 compressors are designed to be driven with an open drive foot mounted motor The rotor and bear ing design set limitations must not b...

Страница 10: ...si with a new oil filter element This is critical for the proper operation of the balance piston which is used to ensure the life of the male and female axial bearing If the speed turndown is more tha...

Страница 11: ...is essential to properly align the coupling to ensure proper bearing and seal perfor mance 1 Select and install the coupling so that it does not trans mit any axial load to the compressor shaft 2 Set...

Страница 12: ...Johnson Controls Frick for additional information for natural gas compression The main oil injection line that connectd to port SM 1 or SM 2 must have a regulating valve to permit adjustment of the o...

Страница 13: ...ht ness of the external piping bolts and valves Ensure that the machine has no oil and vapor leaks If any of these occur shut down the compressor and correct the problem as necessary using good safety...

Страница 14: ...070 750 IOM2 JAN 21 Page 14 HPS 273 ROTARY SCREW COMPRESSOR OPERATION This page is intentionally left blank...

Страница 15: ...odic vibration analysis can be useful in detecting bearing wear and other mechanical failures General information This section provides instructions for normal maintenance a maintenance program and tr...

Страница 16: ...n Check sensor calibration n n n n n n n n n n n n n n n n n n n n n Check BPR function n n n n n n n n n n n n n n n n n n n n n n Test high pressure cut out Test annually Vibration analysis Every 6...

Страница 17: ...it is possible that two relatively obvious problems combine to provide a set of symptoms that can mislead the troubleshooter Be aware of this possibility and avoid solving the wrong problem Warning Av...

Страница 18: ...pling from the motor shaft 4 While supporting the motor and compressor assembly with a crane remove the bolts at the motor feet and then at the compressor feet 5 Thoroughly clean the compressor and mo...

Страница 19: ...pump and check oil pump motor rotation o Leave micro energized to ensure oil heaters are on and oil temperature is correct for start up Do not energize compressor drive motor Only authorized factory f...

Страница 20: ...enter Checked Marked N A Compressor Coupling Hub Runout____________ Motor Coupling Hub Runout_____________ Initial cold alignment Initial hot alignment Final hot alignment Operating log sheet Date Tim...

Страница 21: ..._______ Frame Size __________ H P _________ Refrigerant Ambient Room Temperature _________ F Operating Conditions Vibration data sheet Suction Discharge Oil Separator Slide valve position Press Press...

Страница 22: ...ion high Vi 1 5 8 12UN 2B SM 2 Main oil injection low Vi 1 5 8 12UN 2B SV 1 Class 600 ANSI round flange 1 1 4 Flange T Manifold block tank 1 1 16 12UN 2B Figure 7 Compressor port locations HPS 2709 27...

Страница 23: ...g rings 9 long term storage 5 M maintenance 15 maintenance schedule 16 misalignment 11 mixing valve 12 moisture 5 moisture contamination 15 motor 20 motor mount 7 motor shaft 18 N natural gas 12 nitro...

Страница 24: ...7 Updated Shaft seal section removed last sentence Page 9 Added callout table for Figure Page 10 Updated port information on Customer connections section Added callout table for Figure Page 16 Updated...

Отзывы: