background image

DGA200 Rev160525

2

CONTENTS

List of Tables

Table 1.  Hardware ...................................................................................................... 5

Table 2.  Parts and Assemblies .................................................................................... 6

List of Figures

Figure 1.  DryGear System Parts ................................................................................ 7

Figure 2.  Blower Assembly and Transfer Tube ......................................................... 9

Figure 3.  Manifold and Tent Frame Long Angles .................................................... 11

Figure 4.  Leg Assemblies ......................................................................................... 13

Figure 5.  Blower Assembly Legs ............................................................................. 15

Figure 6.  Tent Frame ................................................................................................ 17

Figure 7.  Manifold, Tent Frame, and Muffler

 .......................................................... 19

Figure 8.  Hanger and Glove Post ............................................................................. 21

Figure 9.  Tent Enclosure .......................................................................................... 23

Figure 10.  Caster Kit ................................................................................................ 25

Figure 11.  Wiring Power .......................................................................................... 27

Figure 12.  Control Box Panel .................................................................................. 29

Table of Contents

CONTENTS ................................................................................................................ 2

INTRODUCTION ...................................................................................................... 3

Overview ................................................................................................................ 3

Specifications

 ......................................................................................................... 4

ASSEMBLY INSTRUCTIONS .................................................................................. 5

Pre-Assembly ......................................................................................................... 5

Tools Required ....................................................................................................... 5

General Notes ........................................................................................................ 7

Assemble Blower Assembly and Transfer Tube .................................................... 8

Assemble Manifolds and Tent Frame Long Angles (6, 7, and 8 Station Only) ... 10

Assemble Legs ..................................................................................................... 12

Install Blower Assembly Legs ............................................................................. 14

Assemble Tent Frame .......................................................................................... 16

Assemble Manifold, Tent Frame, and Muffler

 ..................................................... 18

Install Hanger and Glove Post  ............................................................................ 20

Install Tent Enclosure .......................................................................................... 22

Install Optional Caster Kit ................................................................................... 24

WIRING POWER ..................................................................................................... 26

OPERATION ............................................................................................................ 28

Содержание DRY GEAR PLUS

Страница 1: ...ION www fireresearch com 26 Southern Blvd Nesconset NY 11767 TEL 631 724 8888 FAX 631 360 9727 TOLL FREE 1 800 645 0074 Document Number XM DGA2PM R0A DRYING SYSTEM ASSEMBLY AND OPERATING MANUAL DRY GE...

Страница 2: ...re 9 Tent Enclosure 23 Figure 10 Caster Kit 25 Figure 11 Wiring Power 27 Figure 12 Control Box Panel 29 Table of Contents CONTENTS 2 INTRODUCTION 3 Overview 3 Specifications 4 ASSEMBLY INSTRUCTIONS 5...

Страница 3: ...tor heater element thermistor and control box It supplies warm air to the manifold through the transfer tube The air intake for the blower is located inside the tent enclosure to increase the circulat...

Страница 4: ...5 Volts 220 Amps 19 6 Heater Power 2400 Watts Current Maximum 10 AMPS Thermistor 180 F cutoff Timer 6 Hours Dimensions Length 3 station configuration 71 inches 4 station configuration 86 inches 6 stat...

Страница 5: ...are Description 3 Station 4 Station 6 Station 7 Station 8 Station Screw Flat Head Socket Cap S S 1 4 20 x 1 2 12 12 24 24 24 Screw Socket Cap S S 1 4 20 x 3 4 28 28 44 44 44 Screw Socket Cap S S 1 4 2...

Страница 6: ...Assembly Mount 1 1 1 1 1 1 Muffler 1 1 1 1 1 1 Leg Assembly 4 4 4 4 4 5th Leg Assembly 1 1 1 1 1 1 Leg Brace Blower Side 1 1 1 1 1 Leg Brace Non Blower Side 1 1 1 1 1 Transfer Tube 1 1 1 1 1 Manifold...

Страница 7: ...t size tent frame long angles 50 and 65 inches put together with joining plates For the 8 station DryGear system two manifolds and two tent frame long angles 65 inches are put together with joining pl...

Страница 8: ...2 Lock Washer 3 8 inch 2 Nut 3 8 16 Procedure 1 Install transfer tube 1 on blower assembly 3 with four screws 2 and washers 2 Install control box 6 on chimney assembly 1 with four screws 2 and washers...

Страница 9: ...DGA200 Rev160525 9 Figure 2 Blower Assembly and Transfer Tube 5 1 3 4 6 Motor Slotted Hole Slotted Hole 2 2...

Страница 10: ...ead Socket Cap Screw 1 4 20 1 2 inch 4 16 Socket Cap Screw 1 4 20 3 4 inch 2 16 Flat Washer 1 4 inch Procedure NOTE The distance from the end of the manifold to the manifold glove mount holes is diffe...

Страница 11: ...nd Tent Frame Long Angles 6 Station Manifold 8 Station Manifold 7 Station Manifold 1 3 1 2 4 1 4 4 1 4 5 5 4 6 NOTE The distance between the glove post holes and the correct end of the manifold at the...

Страница 12: ...8 Nut 1 4 20 26 Flat Washer 1 4 inch Procedure NOTE The blower side leg brace 6 has two holes for attaching the blower assembly Ensure that these holes are on the blower side as shown in figure 4 1 Co...

Страница 13: ...DGA200 Rev160525 13 Figure 4 Leg Assemblies 3 7 Non Blower Side 1 4 5 8 2 Blower Side 1 Holes 6...

Страница 14: ...2 4 Flat Washer 3 8 inch 2 Nut 3 8 16 Procedure NOTE The side lower screws that hold the blower side legs to transfer tube do not have washers 1 Connect blower side legs to transfer tube with eight s...

Страница 15: ...DGA200 Rev160525 15 Figure 5 Blower Assembly Legs Blower Side Legs Transfer Tube 3 Blower Assembly Mount Leg Brace 1 Blower Assembly 2 4...

Страница 16: ...a joining plate Refer toAssemble Manifold and Tent Frame Long Angles instructions 2 Tent Frame Long Angle 2 2 Tent Frame End Support 3 12 Flat Head Socket Cap Screw 1 4 20 1 2 inch 4 Procedure NOTE F...

Страница 17: ...DGA200 Rev160525 17 Figure 6 Tent Frame 1 2 3 4...

Страница 18: ...inches 1 4 Socket Cap Screw 1 4 20 3 4 inches 2 14 Flat Washer 1 4 inch Procedure 1 Install manifold in transfer tube top with six screws 1 and washers NOTE For 7 station configuration mount the 60 in...

Страница 19: ...DGA200 Rev160525 19 Figure 7 Manifold Tent Frame and Muffler Manifold 4 Station Manifold Shown Tent Frame 3 View Rotated 90 for Clarity Blower Assembly 2 1 Transfer Tube Blower Assembly...

Страница 20: ...k Washer 5 16 inch Procedure NOTE Make sure the hanger manifold air opening is towards the blower assembly end of the manifold 1 Slide hanger 3 into hole in bottom of manifold with hanger manifold air...

Страница 21: ...igure 8 Hanger and Glove Post Typical Installation Manifold Hanger Manifold Air Opening 1 3 2 NOTE Make sure the hanger manifold air opening is towards the blower assembly The removable hanger install...

Страница 22: ...TE There are two different length cords provided The shorter cord attaches to the inner D ring closest to the Velcro strap 4 Connect cord clips to inner D rings 5 Drop cord ends down under tube and up...

Страница 23: ...gurations is a mirror image NOTE Ensure that the tent frame long angle supports the nylon web between the D rings NOTE Loop the nylon web around the rear tent frame long angle and secure with Velcro O...

Страница 24: ...ers two casters have a break mechanism Procedure NOTE The caster threaded leg plugs may be installed in the leg assemblies at the factory 1 Remove plastic leg plugs from leg assemblies 2 Install threa...

Страница 25: ...DGA200 Rev160525 25 Figure 10 Caster Kit Leg Assembly Caster Threaded Leg Plug...

Страница 26: ...res will support the panel Do not remove wiring to the controls NOTE There are two 3 4 inch access holes in the control box The power cable is installed through either the top or bottom hole 2 Install...

Страница 27: ...Amp Service To Blower Assembly Control Box Input Power Terminal Block Control Box internal wiring not shown for clarity Power Cable Top Access Hole Power Cable Bottom Access Hole Control Box Customer...

Страница 28: ...may be placed inside the enclosure Remove the hanger assemblies DryGear Plus only to roll in racks of hose or loose equipment 1 Place SELECT switch to AIR ONLY position NOTE If the timer is to be set...

Страница 29: ...Figure 12 Control Box Panel NOTE For less than one hour of operation rotate BLOWER HEATER HOURS switch past 1 then back to desired time BLOWER HEATER HOURS TIMER SWITCH Control Box HEATER SELECTED Ind...

Страница 30: ...DGA200 Rev160525 30 NOTES...

Страница 31: ...DGA200 Rev160525 31 NOTES...

Страница 32: ...DGA200 Rev160525 32...

Отзывы: