WIRING POWER
WARNING:
High Voltage. This product must be wired in accordance with the
National Electrical Code (NEC) and applicable local codes and ordinances.
Failure to comply could result in injury to personnel.
NOTE:
Only a licensed electrician should install the power cable.
Procedure
1. Remove four screws and swing control box front panel to the right (internal
wires will support the panel). Do not remove wiring to the controls.
NOTE:
There are two 3/4 inch access holes in the control box. The power
cable is installed through either the top or bottom hole.
2. Install strain relief for power cable in one of the two access holes.
3. Install three conductor 10 AWG power cable through strain relief and access
hole.
3. Connect power cable wires to input power terminal block
L1
,
L2
, and
GROUND.
4. Install control box panel with four screws.
5. Set
BLOWER & HEATER HOURS
switch to
OFF
position.
6. Connect the power cable to 220 volt, 30 amp service.
End Procedure
Содержание DRY GEAR PLUS
Страница 13: ...DGA200 Rev160525 13 Figure 4 Leg Assemblies 3 7 Non Blower Side 1 4 5 8 2 Blower Side 1 Holes 6...
Страница 17: ...DGA200 Rev160525 17 Figure 6 Tent Frame 1 2 3 4...
Страница 25: ...DGA200 Rev160525 25 Figure 10 Caster Kit Leg Assembly Caster Threaded Leg Plug...
Страница 30: ...DGA200 Rev160525 30 NOTES...
Страница 31: ...DGA200 Rev160525 31 NOTES...
Страница 32: ...DGA200 Rev160525 32...