background image

 

Type RK370 

 

 

 

 

 

 

 

 

 

 

 

 

Fig.  7c 

4.4.3.  Valve installed remote from the fire barrier acc. to diagram in Fig. 8a and 8b. 

4.4.3.1. Distance  from  the  fire  barrier  is  marked  as  length  “X”  of  ventilation  duct  protruding  from  the 

wall constituting the fire barrier acc. to Fig. 8a and 8b. 

4.4.3.2. Place the duct in the fire barrier in the previously prepared opening acc. to section 4.2. at the 

appropriate length “X”, ensuring the designed distance of the valve from the fire barrier. 

4.4.3.3. Assemble  the  valve  with  the  duct  so  that  its  drive  remains  outside  the  insulation  (cf.  Fig.  8a 

and 8b).  

4.4.3.4. Install ventilation ducts to the valve on one side and to the duct in the fire barrier on the other, 

suspending them at a distance not greater than 3 m from the fire barrier axis. 

4.4.3.5. Such  suspended  duct  with  the  valve  after  relevant  setting  in  the  fire  barrier  must  be  sealed 

with insulation meeting the requirements of fire insulation of the barrier, e.g. conlit. 

4.4.3.6. Section (X +120) mm of the duct and valve type V370 acc. to Fig. 8a, and section (X + 100) 

mm of the duct and valve type RK370 acc. to Fig. 8b, must be insulated with PROMATECT L 
500  boards  with  52  mm  thickness.  At  the  joint  of  the  valve  with  the  fire  barrier,  at  the  entire 
circumference, make an additional band of PROMATECT L or L 500 boards with the thickness 
of 52 mm acc. to Fig. 8a or 8b.  Such an insulation coating must be closed from the head with 
PROMATECT  L  500  board  with  the  thickness  of  30  mm.  Before  the  frontal  closure  of  the 
insulation coating, tightly fill the  gaps between the valve body and the internal circumference 
of the coating with stripes of mineral wool with the cross-section 10x28 mm, and place a layer 
of PROMASTOP on it. 

4.4.3.7. Frontal closure of the insulation coating for valves of V370 type must be made with stripes of 

PROMATECT L or L500 board with thickness of 30  mm, width  81 mm and lengths allocated 
according to cross dimensions of the valve installed, so that along sides “B”, there are stripes 
by 2.5 mm longer than nominal dimension, and along sides “H”, there should be stripes by 164 
mm longer than  nominal dimension of the side.  Stripes of the board along side “B” can have 
cuts of 3 mm each on both ends along dimension “B”, and 30 mm along the width of the stripe 
(81mm).    In  turn,  in  the  case  of  valve  of  RK370  type,  as  frontal  closing,  make  a  blind  of 
PROMATECT L or L 500 board with thickness of 30 mm in the form of square with dimensions 
Dn + 176 mm with opening cut in the axis, with diameter Dn + 2.5 mm. The blind installed at 
the circumference of the valve body must be sealed with PROMASTOP COATING and MG III, 
and to the casing coating after prior gluing. 

Bilateral sealing 
of valve and wall 
with fire-safety 
mass e.g. 
PROMASEAL-
Mastic 

Mineral wool min. 100kg/m

 

Mineral wool 

Steel profile of plaster w. 

Plaster boards 

Plaster boards around

 

Plaster boards around

 

Mineral wool 

Mineral wool 

P

la

st

e

b

o

a

rd

1

2

,5

m

m

 

o

v

e

rl

a

Fixing  clamps

4 items

Screw 3.5x25mm

 

Valve RK370

 

drive

 

Detail Fig. 7c

 

Содержание RK370

Страница 1: ...CAL OPERATIONAL DOCUMENTATION FIRE SAFETY VALVES type V370 and RK370 MANUFACTURER FRAPOL Sp ka z o o 30 832 Krak w ul Mierzeja Wi lana 8 Phone 012 653 27 66 653 27 67 653 26 92 fax 012 653 27 89 MARCH...

Страница 2: ...ERISTICS 3 3 VERSIONS 4 4 PRINCIPLES FOR INSTALLATION OF FIRE VALVES 6 5 PRINCIPLES FOR FIRE VALVES MAINTENANCE 16 6 PERIODICAL MAINTENANCE 18 7 LIST OF SPARE PARTS 19 8 TECHNICAL DATA OF ACTUATORS AN...

Страница 3: ...BELIMO actuator thermal trigger mechanical or electrical thermal element Valves can be furnished with a thermal trigger adjusted to actuation at the temperatures of 72 5 C or 90 5 C For V370 valves bo...

Страница 4: ...heat responsive device involves air stream flowing round the thermal element glass ball or soldered metal plates causes heating of the liquid inside the ball or solder which causes breaking of the gl...

Страница 5: ...ith a return spring made of wire with diameter of 3 mm are furnished with solenoid with keeper holding strength of 120 N Valves with a return spring made of wire with diameter of 3 5 mm are furnished...

Страница 6: ...s switch the cut off partition of the valve from closed to open position at the same time stretching the closing spring After turning the lever to full opening of the valve hook the lever on manual tr...

Страница 7: ...Fig 1a Fig 1b Fig 1c Type RK370 Fig 2a Fig 2b Fig 2c 4 1 4 Check for the size and shape of openings prepared in the walls to set the valves acc to section 4 2 4 1 5 Check whether after valve installa...

Страница 8: ...cumference 4 3 9 On both sides of the valve partition inside the ventilation duct there must be free space to allow for its opening 4 3 10 Electrical installation of the signalisation and powering of...

Страница 9: ...of the valve should remain within the axis of the partition Assembly of the valves in this version in fire barriers class EI120 but with greater thicknesses must be made observing partition depth acc...

Страница 10: ...rier with class EI120 and thickness of 125 mm the cut off partition of the valve should remain in the axis of barrier thickness Valves of V370 type must protrude from the wall on the drive side to the...

Страница 11: ...aster board 12 5mm 4 layers Plaster board 12 5mm 2 warstwy Screws for plaster Cut off partition Suspended ventilation duct Suspended ventilation duct Mineral wool with thickness of min 100kg m 3 or fi...

Страница 12: ...head with PROMATECT L 500 board with the thickness of 30 mm Before the frontal closure of the insulation coating tightly fill the gaps between the valve body and the internal circumference of the coa...

Страница 13: ...ounts to 0 mm acc to Fig 8c and 8d 4 4 4 2 Further procedure is analogical as in the case of section 4 4 2 except for number of valve suspensions Fig 8c Fig 8d Mineral wool Duct Suspension axis Suspen...

Страница 14: ...Control cabinet Control cabinet Control cabinet Control cabinet Control cabinet Control cabinet Thermal el Thermal el Thermal el Thermal el Thermal el Thermal el solenoid transformer transformer tran...

Страница 15: ...LF24 ST or BF24 ST actuators via BKN230 24 connect clamps 1 and 3 of thermal element with limit switch to clamps 1 and 2 on the BKN230 24 device in place of the keeper which must be removed 4 6 2 Diag...

Страница 16: ...ace the thermal element item 3 unscrew the nut item 4 press the spring item 7 with the element and after the element item 1 is bent to the side remove the glass element item 3 from the steel clip item...

Страница 17: ...ever item 1 resting on the limiter item 4 and next remove lever item 1 and damaged spring item 2 Place the spring on the middle opening in the manual lever and place the whole on drive shaft item 5 Du...

Страница 18: ...en the valve and hook the manual lever item 1 at the element item 2 For valves in HE version during the test observe correct signalling by micro switch item 3 of cut off partition s position If irregu...

Страница 19: ...P42 IP42 IP54 IP54 IP54 Auxiliary switch 2xEPU 6 3 A 250V 2xEPU 6 3 A 250V 2xSPDT 6 1 5 A AC250V 2xSPDT 6 1 5 A AC 250V Socket to connect BKN230 24LON or BKN230 24MP Connection point 5 80 5 80 5 80 5...

Страница 20: ...f the condition of conductors powering the actuator solenoid and limit switches 6 Assessment of the condition of the partition and the seals expansion and ventilation seal 7 Check of correct closing o...

Отзывы: