INSTALLATION INSTRUCTION MANUAL
TANK DRAWDOWN
4
7. Connect the green wire to the pressure sensor (J11) terminal at the SubDrive.
Connect the white wire to the piggyback connector at J11.
8. Connect the Jumper wire to the pressure sensor (J11) terminal and to the
Common (COM) terminal of the Auxiliary Relay Board.
9. Connect the black wire from the cut-in pressure switch to the Normally Closed
(NC) terminal on the Auxiliary Relay Board. Connect the Red wire from the
regulating pressure switch to the Normally Open (NO) terminal on the Auxiliary
Relay Board.
Содержание SubDrive NEMA 4
Страница 1: ...SubDrive Tank Drawdown Installation Instruction Manual 225770901...
Страница 3: ...INSTALLATION INSTRUCTION MANUAL TANK DRAWDOWN...
Страница 4: ...INSTALLATION INSTRUCTION MANUAL TANK DRAWDOWN...
Страница 15: ...INSTALLATION INSTRUCTION MANUAL TANK DRAWDOWN Notes...
Страница 16: ...INSTALLATION INSTRUCTION MANUAL TANK DRAWDOWN Notes...