User Manual EML1101
Load settings
Choose reset via date when the electricity company carries out the counter reading (e.g. at an exact
time given every month on the 27
th
day at 4am.) The reset day and time are set with the front fascia
buttons.
7.9.10.4
Active Pulse Monitoring Alarm
The maximum time
that may elapse
between two active pulses before an alarm is triggered can be
entered here.
If a number of inputs are used
(as of
FRAKO system option
) a time must be entered that is
distinctly higher than the maximum time between two pulses. The input with the lowest pulse rate
dictates this value. If one of the 3 inputs exceeds this time, an alarm is activated and it is entered in
the event list.
The factory default setting is 0. This setting disables this monitoring function.
7.9.10.5 . Group
Grouping means that groups can be formed with related loads.
An example for grouping in a sheet metal work.
In this case it should be switched as follows:
Turn off
Turn on
1) Stop material supply
1) Turn on cooler
2) Turn off heat
2) Start roller
3) Stop roller
3) Turn on heat
4) Stop cooler
4) Start material supply
Load 1, priority 10
Load 2, priority 8
Load 3, priority 6
Load 4, priority 4
If the minimal off time is not fulfilled in the above example, the
load
will not be switched on. Loads that
do not belong to a group can be switched, between the individual switching of the group. Up to 8
groups are possible. The group numbers serve to differentiate the individual groups. The switching
order of the groups themselves, is determined alone by the priority of the individual channels. (See
section 8.9
7.9.10.6 Units
This menu item enables a changeover from kW to MW.
The highest adjustable maximum demand is 6500kW or 6500MW.