![FPM Agromehanika 627 678 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/fpm-agromehanika/627-678/627-678_assembly-operation-maintenance-spare-parts-list_2326008015.webp)
ASSEMBLY INSTRUCTION
FPM
Boljevac
For easier transport of FPM 627 726678 and FPM 627 713 rotary mowers, few parts and
assemblies have been removed in order to minimize the size. To properly assemble the mower,
proceed as follows:
-
Place the V-belts (D) onto the pulleys; loosen the nuts (A) while simultaneously tightening
the nut (D) (Fig. 5). The V-belts are properly tensioned, if maximum sag of 10 mm is
achieved when 3.5 daNm force is applied. When tensioning the belts, ensure that the pulley
housing is sliding on the guide (A; Fig. 5a). When tensioning force is achieved, tighten the
pulley house using the nuts (A; Fig. 5) to complete the assembly.
Page 15
1.
-
To mount the support frame to the cutting unit
-
Secure the free yoke connecting the support frame
and the step-up gear unit with two self-locking nut
(A) (Abb. 2). In order to ensure safe support of the
cutting unit, tighten the nuts (A) with a torque of
13.5 daNm.
ATTENTION:
For your personal safety, prevent the frame
from overturning and turning during assembly.
2.
-
To assemble the pulley guard and V-belts
-
Mount the front guard side (A; Fig. 4) and attach it using
the screws (B) and tightening torque of 5 daNm,
Four-
disc mowers have pulley with three grooves for V-
belts.
-
Clean the pulley opening (A; Fig. 3) and slide it onto the
shaft of the step-up gear unit (Fig. 4, pos. D). Secure it
with the provided washer and nut. Insert the protrusion
(B; Fig. 3) of the pulley hub towards the step-up gear
unit.
Содержание 627 678
Страница 35: ...DECLARATION OF CONFORMITY 2006 42 EC FPM Boljevac Page 35...
Страница 45: ......
Страница 59: ...Page 59 ASSEMBLY CANVAS COVER...