ROOF BATTENS & PLASTIC ROOF TRIMS
Secure the Back Roof Battens to the Back T&G
Panels (BM & BN). You will need to lift up the
overhanging EPDM to do this. Ensure each
batten’s edge is flush to the top of the T&G panel.
Secure with 3 x 80mm screws per batten.
127
127
Fold the EPDM in a tucked position against the
front and back of the side panels as shown above.
131
131
Use the pins provided with the plastic trims. Pin
into the batten behind to secure in place.
133
133
Repeat the same process for the other batten’s on
top of the other T&G Side Panels (BB & BC). Screw
into place using 2 x 80mm screws. Repeat the
process on the opposite side.
130
130
To install the Angled Roof Battens, lift the EDPM
and slot the matching batten’s listed in the
components list into place above each T&G Side
Panel (BB & BA).
128
128
Screw into place using 2 x 80mm screws. Ensure
the batten is butted up to the T&G panel and wall
panel behind.
129
129
The other plastic trims will need to be measured
and cut using a hand saw to fit next to the fixed
roof trim. Further detail will be shown throughout
the application of the trims below.
134
134
Slot the plastic trim on the top edge, flush to the
back.
132
132
23