16
fig. 6
SI
RC
RS
SV
2.2.
Dimensions
S
Condensate drain
F
Water mains intake (KC and KR)
RB
Secondary return from the boiler
(only KRB model)
G
Gas intake
SI
Inspection trap plug
M
CH system flow
C
DHW flow (KC model only)
SV
3-bar safety valve drain cock
RC
Filling tap
R
CH system return
RS
Drain cock
MB
Secondary flow to the boiler (only KRB model)
71
43
56
98
75
98
80
138
177
46
G
M
MB
RB
RC
R
SV
SI
View from the bottom of models KC and KR
View from the bottom of model KRB
In model KRB the connection to the cold water mains must be made through the 1/8’’ connection on the loading tap (shown with a
broken line in the figure above).
139,5
135
148
90
90
77
325
750
450
138
177
56
98
75
98
80
71
43
4
6
G
M
F
R
S
C
Содержание TAHITI CONDENSING IST 03 C 298 - 02
Страница 1: ...IST 03 C 298 02 INSTALLATION USE AND MAINTENANCE TAHITI CONDENSING GB...
Страница 22: ...22 fig 10...
Страница 42: ...42...
Страница 43: ...43...