![Fondital KR 55 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/fondital/kr-55/kr-55_installation-and-use-manual_2315358003.webp)
3
General information for fitters, maintenance technicians and users
This INSTRUCTION MANUAL, which is an integral and indispensable part of the product, must be handed over to the user by the
installer and must be kept in a safe place for future reference. The manual must accompany the boiler should it be sold or its possession
transferred. Following installation, the fitter is to advise the user about boiler operation and the safety devices.
This boiler is designed for connection to a central heating system.
Any other use is considered incorrect and therefore dangerous.
The boiler must be installed by qualified personnel, in compliance with the applicable laws and standards and according to the manufac-
turer’s instructions given in this manual. Incorrect installation may cause injury to persons and/or animals and damage to property. The
manufacturer shall not be held liable for any such injury and/or damage.
Damage and/or injury caused by incorrect installation or use, or resulting from failure to follow the manufacturer’s instructions will relieve
the manufacturer of all contractual and extra-contractual liability.
Before installing the boiler, check that the technical data correspond to the requirements for correct use within the system.
Check that the boiler is intact and has not been damaged during transport and handling: do not install equipment which is damaged or
faulty.
Do not obstruct the air intakes.
Only original accessories supplied by the manufacturer must be used.
All the packaging materials can be recycled and should be disposed of accordingly.
Keep the packaging out of the reach of children as it can cause a hazard.
In the event of failure or faulty operation, switch off the boiler. Do not attempt to make repairs; contact a qualified technician.
Manufacturer-approved and supplied parts must be used for all repairs to the boiler.
Failure to comply with the above requirements may affect the safety of the boiler and endanger people, animals and property.
In order to guarantee efficient and correct operation of the equipment, the manufacturer recommends that the boiler be serviced and
repaired by one of its Authorized Service Centre.
Routine boiler maintenance should be performed according to the schedule in the relevant section of this manual. Appropriate boiler
maintenance ensures efficient operation, preservation of the environment, and safety for people, animals and property. Incorrect or
irregular maintenance can cause a hazard for people, animals and property.
Any maintenance and repair operations must be carried by one of our fully qualified Authorized Service Centres.
In the event of long periods of inactivity, disconnect the boiler from power mains and close the gas tap.
Warning! When power mains are disconnected, the boiler’s electronic anti-frost function will be deactivated.
Anti-freeze should be added if there is a risk of freezing. Use specific anti-freeze products suitable for multi-metal heating systems.
It is not advisable to empty the system as this may result in damage.
If you smell gas:
• do not turn on or off electric switches and do not turn on electric appliances;
• do not ignite flames and do not smoke;
• close the main gas tap;
• open doors and windows;
• contact a Service Centre, a qualified installer or the gas supply company.
Never use flames to detect gas leaks.
The boiler is designed for installation in the country indicated on the rating plate. Installation in any other country may be source of
danger for people, animals and objects.
The Manufacturer cannot be held contractually or extra-contractually liable in the event of failure to comply with the above.
Содержание KR 55
Страница 1: ...IST 03 C 000 01 INSTALLATION USE AND MAINTENANCE TAHITI CONDENSING KR 55 KR 85 GB...
Страница 22: ...22 KR KR KR KR KR KR 0DIMACAR12 fig 12 Coupling Coupling M Flow 1 G Gas 3 4 F Cold water 1 2 R Return 1...
Страница 34: ...34 fig 21 A 3 5 Wiring diagram 55 KW...
Страница 35: ...35 fig 21 B 85 KW...
Страница 42: ...42...
Страница 43: ...43...