3.2.6.2. Air intake and flue gas discharge configuration – model  KR 55 

 

These values refer to air intake and flue gas discharge systems comprised of original smooth and rigid pipes supplied  

 

by the Manufacturer. 

Types B23 and B53 (Ø 80 mm)

With this type of boiler, place one of the caps and seals provided 
on one of the two air intakes in the top of the boiler. 

The minimum length of the flue gas discharge pipe is 1 metre. 
The maximum length of the flue gas discharge pipes is 55 metres.

With pipes up to 30 metres in length, fit a 47mm air intake dia-
phragm in the other air intake in the top of the boiler. 
For each additional 90° elbow the maximum length must be redu-
ced by 2.5 metres. 
For each additional 45° elbow the maximum length must be redu-
ced by 2 metres. 
The roof terminal decreases the maximum length by 1 metre. 
The wall terminal decreases the maximum length by 1 metre. 

Type C13 (Ø 60/100 mm or 80/125 mm)

With this type of boiler, place both caps and seals on both air inta-
kes in the top of the boiler. 
The minimum length for horizontal coaxial pipes is 1 metre, exclu-
ding the first elbow connected to the boiler. 
The maximum length for 60/100 horizontal coaxial pipes is 5 me-
tres, excluding the first elbow connected to the boiler. 
The maximum length for 80/125 horizontal coaxial pipes is 13 
metres, excluding the first elbow connected to the boiler. 
For each additional 90° elbow the maximum length must be redu-
ced by 1 metres. 
For each additional 45° elbow the maximum length must be redu-
ced by 0.5 metres. 
The wall terminal decreases the maximum length by 1 metre. 
The air intake part must be angled 1% downwards in the outlet 
direction to prevent rainwater from getting in. 

Type C33 (Ø 60/100 mm or 80/125 mm)

With this type of boiler, place both caps and seals on both air inta-
kes in the top of the boiler. 
The minimum length for vertical coaxial pipes is 1 metre. 
The maximum length for 60/100 vertical coaxial pipes is 5 metres. 
The maximum length for 80/125 vertical coaxial pipes is 13 metres. 
For each additional 90° elbow the maximum length must be redu-
ced by 1 metres. 

For each additional 45° elbow the maximum length must be redu-
ced by 0.5 metres. 
The roof terminal decreases the maximum length by 1 metre. 

Types C43 - C53 - C83 (Ø 80 + 80 mm)

With this type of boiler, place one of the caps and seals provided 
on one of the two air intakes in the top of the boiler (the one not 
used for air intake).
The minimum length of the air intake pipe is 1 metre. 

The minimum length of the flue gas discharge pipe is 1 metre. 
The maximum length of air intake and flue gas discharge pipes is 

55 metres (adding the intake and discharge length).
With pipes up to 30 metres in length, fit a 47mm air intake dia-
phragm in the air intake in the top of the boiler. 
For each additional 90° elbow the maximum length must be redu-
ced by 2.5 metres. 
For each additional 45° elbow the maximum length must be redu-
ced by 2 metres. 

The roofl terminal decreases the maximum length by 1 metre. 

The wall terminal decreases the maximum length by 1 metre. 

3.2.6.3. Air intake and flue gas discharge configuration – model  KR 85 

 

These values refer to air intake and flue gas discharge systems comprised of original smooth and rigid pipes supplied  

 

by the Manufacturer. 

Types B23 and B53 (Ø 80 mm)

The minimum length of the flue gas discharge pipe is 1 metre. 
The maximum length of the flue gas discharge pipes is 50 metres.

For each additional 90° elbow the maximum length must be redu-
ced by 3.3 metres. 
For each additional 45° elbow the maximum length must be redu-
ced by 1 metres. 
The roof terminal decreases the maximum length by 1 metre. 
The wall terminal decreases the maximum length by 1 metre. 

Types C43 - C53 - C83 (Ø 80 + 100 mm)

The minimum length of the air intake pipe (Ø 80 mm)  is 1 metre. 
The minimum length of the flue gas discharge pipe (Ø 100 mm)  is 
1 metre. 
The maximum length of air intake and flue gas discharge pipes is 
43 metres (adding the intake and discharge length).
For each additional 90° elbow on the air intake pipe the maximum 
length must be reduced by 5.5 metres. 
For each additional 90° elbow on the flue gas dischage pipe the 

Cap and seal for the air 
intake (*) 

Cap and seal for the air 
intake (*)

(*) Caps for the air intake are supplied with the boiler, but NOT mounted on it. They can be found inside the box. 

Содержание KR 55

Страница 1: ...IST 03 C 000 01 INSTALLATION USE AND MAINTENANCE TAHITI CONDENSING KR 55 KR 85 GB...

Страница 2: ...one of our boilers Please read these instructions carefully They will enable you to install operate and service the equipment properly Any maintenance and repair operations must be carried by one of o...

Страница 3: ...oiler Do not attempt to make repairs contact a qualified technician Manufacturer approved and supplied parts must be used for all repairs to the boiler Failure to comply with the above requirements ma...

Страница 4: ...he fitter pag 27 3 1 Installation standards pag 27 3 2 Installation pag 27 3 2 1 Packaging pag 27 3 2 2 Choosing where to install the boiler pag 27 3 2 3 Positioning the boiler pag 27 3 2 4 Installing...

Страница 5: ...ernal probe operation pag 32 Fig 21A Wiring diagram for KR 55 pag 34 Fig 21B Wiring diagram for KR 85 pag 35 Fig 22 Adaptation to other gas types for KR 55 pag 37 Fig 23 Adaptation to other gas types...

Страница 6: ...ia attiva solo se la caldaia collegata ad un sistema di preparazione dell acqua calda sanitaria esterno Hot water is only provided if the boiler is connected to a separate water heater With the select...

Страница 7: ...ig 1 The problem must be solved before the boiler can be restarted f Burner shutdown indicator This comes on when the burner shutdown device activates due to a malfunction To restart the boiler turn t...

Страница 8: ...h normal operation If the boiler is connected to a separate water heater Malfunction Boiler not powered on Boiler shutdown due to flame absence Boiler shutdown due to safety thermostat activation Boil...

Страница 9: ...he temperature range must be set by the fitter or an Authorized Service Centre 3 2 11 9 During temperature setting the CH symbol on the LCD flashes and the CH setting is displayed When the CH system r...

Страница 10: ...ffectively against freezing by means of specific anti freeze additives suitable for use in multi metal systems It is important to check the effectiveness of the anti freeze product periodically Do not...

Страница 11: ...an external probe is installed knob 4 Fig 1 loses its CH water temperature fun ction and becomes a fictitious ambient temperature regulator Fig 3 for the temperature desired in the rooms to be heated...

Страница 12: ...gineer 1 5 3 Shutdown due to air flue gas system malfunction If the air flue gas system malfunctions the boiler shuts down The burner shutdown symbol is displayed and code E03 flue gas thermostat flas...

Страница 13: ...boiler will continue to operate but the sliding temperature function is disabled The temperature of the CH water is regulated ac cording to the position of regulator 4 Fig 1 which in this case loses i...

Страница 14: ...witch detecting no water in the CH system CH temperature probe Safety thermostat Flue gas thermostats Filling tap User interface Liquid crystal display showing the boiler operating status Mode selecto...

Страница 15: ...take 1 2 G Gas intake 3 4 SI Condensate trap M CH system flow 1 RC Filling tap R CH system return 1 450 750 30 50 43 56 173 98 80 220 5 127 62 148 135 89 78 534 S SI G M F R RC Aspirazione aria scaric...

Страница 16: ...62 534 43 56 173 98 80 220 5 S SI G M F R RC Scarico fumi 100 mm Aspirazione aria 80 mm fig 7 S Condensate drain F Water mains intake 1 2 G Gas intake 3 4 SI Condensate trap M CH system flow 1 RC Fil...

Страница 17: ...6 CH temperature probe 7 Flue gas thermostat 8 Inspection trap plug 9 Condensate drain pipe 10 Pre mixing burner 11 Twin differential minimum water pressure switch 12 Gas valve 13 Safety thermostat 14...

Страница 18: ...temperature probe 7 Flue gas thermostat 8 Inspection trap plug 9 Condensate drain pipe 10 Pre mixing burner 11 Twin differential minimum water pressure switch 12 Gas valve 13 Safety thermostat 14 Circ...

Страница 19: ...Data If connected to a water heater with NTC probe 10 k 3435 Value referred to 15 C 1013 mbar KR 55 Pmax Pmin 30 heat output Casing heat loss with burner on 0 46 0 83 Casing heat loss with burner off...

Страница 20: ...20 2 8 Pumping head fig 10 V1 V2 V3 V1 Pump speed I min V2 Pump speed II V3 Pump speed III max V1 V2 V3 V1 Pump speed I min V2 Pump speed II V3 Pump speed III max fig 11 KR 55 KR 85...

Страница 21: ...emplate Fig 12 3 2 2 Choosing where to install the boiler The following must be taken into account when choosing where to install the boiler Read the instructions in 3 2 6 Air intake flue gas discharg...

Страница 22: ...22 KR KR KR KR KR KR 0DIMACAR12 fig 12 Coupling Coupling M Flow 1 G Gas 3 4 F Cold water 1 2 R Return 1...

Страница 23: ...ure Fix the template to the wall Fig 12 Drill four 12 mm holes in the wall for the wall plugs If necessary drill holes in the wall for the air intake and flue pipes Fix the bracket onto the wall using...

Страница 24: ...densing boilers made by the Manufacturer which are resistant to the acids in the condensate The discharge pipes must be installed sloping towards the boiler This is to allow the condensate to flow bac...

Страница 25: ...be at least 250 mm and both terminals must be positio ned within a square having 500 mm sides The boiler must be equipped with a fan before the combustion chamber heat exchanger Type C33 Boiler desig...

Страница 26: ...the maximum length must be redu ced by 1 metres For each additional 45 elbow the maximum length must be redu ced by 0 5 metres The roof terminal decreases the maximum length by 1 metre Types C43 C53...

Страница 27: ...room thermostat if there is one ON and the boiler in operation press the chimney sweep button Fig 15 for a few seconds The boiler turns off performs the ignition sequence and runs at a preset stable...

Страница 28: ...pplicable rules and regulations in the country of installations which are intended as an integral part of this handbook Please note that before activating an indoor gas supply system and before connec...

Страница 29: ...stic waste system The condensate drainage system and the domestic waste system must be made of suitable materials that are resistant to the condensate The Manufacturer cannot be held liable for damage...

Страница 30: ...sheathed together with the power cables 3 2 13 Connecting the OpenTherm remote control optional The boiler can be connected to a remote control an optional supplied by the manufacturer It must be ins...

Страница 31: ...n the boiler s printed circuit board Fig 21 The temperature probe cables must NOT be sheathed together with power cables The temperature probe must be installed on an outside wall facing north or nort...

Страница 32: ...regulation trimmer determines the CH operating range according to the following values The fictitious ambient temperature is set on knob 4 Fig 1 which loses its CH temperature control function 1 4 7 a...

Страница 33: ...er perform the following procedure to make sure that the pump works Unscrew the protection bolt in the centre of the pump motor Insert the tip of a screwdriver in the hole and turn the pump shaft cloc...

Страница 34: ...34 fig 21 A 3 5 Wiring diagram 55 KW...

Страница 35: ...35 fig 21 B 85 KW...

Страница 36: ...length 3 metres TA ambient thermostat optional CM1 CM2 jumpers for selecting the type of boiler FL DHW flow switch FLP Safety flow switch for low water in the primary circuit CH VG gas valve TL limit...

Страница 37: ...t output setting is displayed on the LCD as a percentage of the boiler s maximum value position selector 2 fig 1 to WINTER check that the optional ambient thermostat optional is set to ON activate the...

Страница 38: ...corresponds to the setting iIf necessary the boiler must be converted according to the instructions in 3 6 Adapting to other gases This operation must be carried out by a qualified service engineer th...

Страница 39: ...gas stack State of the combustion fan State of the Hall sensor General integrity of the boiler safety devices Water leaks and oxidation of the boiler fittings Boiler safety valve efficiency Expansion...

Страница 40: ...the boiler safety thermo stats has cut in Difficult draught at chimney Check the chimney and ambient air suction grilles Flue gas thermostat faulty Replace it The boiler has shut down The symbol is d...

Страница 41: ...mote control is switched off The symbol is displayed and code E22 flashes Operation is resumed automatically when the cause of shutdown has been removed No communication with remote control Cable betw...

Страница 42: ...42...

Страница 43: ...43...

Страница 44: ...96 257 e mail fondital fondital it www fondital it Il produttore si riserva il diritto di apportare ai propri prodotti quelle modifiche che riterr necessarie o utili senza pregiudicarne le caratterist...

Отзывы: