background image

108

will  light  up  at  the  same  time.  To  guaran-

tee  an  always  optimal  output  from  the

generator  it  is  advised  not  to  go  below  a

minimum operating temperature of 60 °C.

TURNING THE BOILER OFF  

(fig. 1)

To turn the boiler off place the selector

knob on the 

OFF 

position. If the boiler is

not  going  to  be  used    for  a  lengthy

period  it  is  advised  to  turn  off  the  elec-

tricity  supply,  close  the  gas  tap,  and  if

the  temperatures  foreseen  are  low,

emp ty  t he  boiler  and  t he  hydr aulic

system  to  avoid  breakage  in  the  tubes

due to the freezing of the water.

GAS CONVERSION

If  gas  conversion  proves  to  be  necessary,

refer  exclusively  to  an  authorised  SIME

technician.

CLEANING AND 

MAINTENANCE

The programmed maintenance of the gene-

rator is carried out annually. 

It  mus t  be  r eques t  fr om  t he  near es t

Authorised  Technical  Service  between

April and September. 

The boiler comes with an electricity supply

cable  which,  in  case  of  replacement,  must

be requested only from SIME.

FAULT FINDING

Starting failure  

(fig. 3)

If the burner fails to start the red led will

light up (

). 

To attempt starting it again, the selector

knob must be turned to the position (

)

and released soon after, returning to the

summer (

) or winter (

). 

If  the  failure  should  occur  again,  call

the  Authorised  Technical  Service  for

assistance.

Insufficient water 

pressure  

(fig. 4)

If  the  red  led 

“0.5  bar”

intermittently

lights up, the boiler is not functioning. To

restore  functioning  act  on  the  filling  tap

until the green led 

“1 bar”

lights up.

Once filled close the filling tap.

If  all  the  leds  are  off,  call  the  nearest

Authorised Technical Service.

SPIA ROSSA

Fig. 3

Fig. 4

SPIA ROSSA INTERMITTENTE
IN CONDIZIONE DI SICUREZZA

SPIA VERDE IN CONDIZIONE
DI FUNZIONAMENTO

APRE

RED LED

FLASHING RED LED
IN SAFETY CONDITION

GREEN LED IN
OPERATING CONDITION

OPEN

Содержание LOGO 22 OF

Страница 1: ...e boiler is set for operation for the type of gas supplied Check that the flue pipe for the outlet of the products of the combustion is unobstructed Make sure that any shutoff valves are open Make sur...

Страница 2: ...50 D H W tanks LOGO 32 50 OF 32 80 OF central heating and D H W production electronic ignition and modulation natu ral draught Follow the instructions given in this manual for the correct installation...

Страница 3: ...tank unit BT150 version CONNECTIONS M C H flow 3 4 M R C H return 3 4 M E D H W inlet 1 2 M G Gas connection 3 4 M U D H W outlet 1 2 M C Re circulation 1 2 F S1 Safety valve drain 1 2 F S2 D H W tank...

Страница 4: ...D H W circulating pump 10 C H circulating pump 11 Gas valve 12 Burners 13 Non return valve 14 Burners manifold 15 Water pressure transducer 16 Boiler drain cock 17 D H W expansion vessel 18 D H W safe...

Страница 5: ...40 80 40 80 40 80 40 80 D H W setting range C 10 60 10 60 10 60 10 60 Category II2H3P II2H3P II2H3P II2H3P Type B11BS B11BS B11BS B11BS Smokes temperature C 108 110 116 119 Smokes flow gr s 18 5 23 2...

Страница 6: ...W expansion vessel 5 Manual filling group 6 D H W tank 7 D H W tank drain cock 8 Boiler drain cock 9 Burners manifold 10 Pilot burner 11 C H circulating pump 12 Gas valve 13 Gas pressure switch 14 Saf...

Страница 7: ...connect up the boiler you are recommended to make the air cir culating in the piping in order to eliminate any foreign bodies that might be detrimen tal to the operating efficiency of the applian ce...

Страница 8: ...t this operation check that the filling tap is closed 2 5 FLUE The flue for the atmospherical expulsion of the combustion products from natural draught appliances must meet the following requirements...

Страница 9: ...nector ends 3 dama ges irreparably the control panel Before the connection make sure that there is no voltage 2 6 2 Logica Remote Control connection fig 6 pos B The electrical systems must be in com p...

Страница 10: ...on the inspection control and cleaning flange of the tank 2 6 5 Wiring diagram J7 J5 J4 J3 J2 KEY TR Transformer 230 24V TRA Ignition transformer P C H circulating pump PB D H W circulating pump EA I...

Страница 11: ...through a window contact Anti bacterial 2 7 1 Installation The unit must be installed in the main living room For installation follow the assembly instructions inserted in the package At this point w...

Страница 12: ...until it finds the optimum switch off time 59 60 SETTING THE HOT WATER SERVICE PARAMETERS Reduced hot water temperature value Hot water service filling The hot water may be set to a reduced temperatu...

Страница 13: ...witch over to reduced pre set value of the ambient temperature 3 With an external contact it is possible to switch over to reduced pre set value of the antifreeze ambient temperature short circuit 0 0...

Страница 14: ...eginning when the plant is cold and in the subsequent startings This is so to avoid ignitions and switching off with very short intervals that may in particular be found in plants with high losses At...

Страница 15: ...ntinuous jump spark from the electrode is noted despite the pilot burner being lit After 20 seconds the sparking stops the burner goes off and the block signal lights up The cable of the detector elec...

Страница 16: ...PERTURA TA 6 SB 11 SB 12 CIRCUITO CON VALVOLE DI ZONA NOTA I rel vengono impiegati solo nel caso le valvole di zona siano prive di micro L N TA TA1 VZ R VZ1 R1 NOTA PER VERSIONI SOLO RISCALDAMENTO Sos...

Страница 17: ...g potentiometer knob on the maximum value Using a 10 wrench turn the nut 3 to find the maximum pressure as shown in Table 2 to reduce the pressure turn the nut anti clockwise to increase the pres sure...

Страница 18: ...ENANCE Carry out the cleaning of the generator in the following way fig 18 Remove the electricity supply to the boi ler and close the gas supply tap Dismantle the gas group completely Dismantle the li...

Страница 19: ...erature always with the primary circuit controlled between 80 C and 70 C During the entire duration of the testing the hot water taps must remain open After verifying the combustion the boiler should...

Страница 20: ...C and the yellow led of the hot water will light up at the same time In the versions with storage capacity when there is no request for hot water service and heating the leds and are off the operatin...

Страница 21: ...ed Technical Service between April and September The boiler comes with an electricity supply cable which in case of replacement must be requested only from SIME FAULT FINDING Starting failure fig 3 If...

Страница 22: ...hts up To attempt to start the boiler again unscrew the cover of the thermostat and reset the button under neath After 10 minutes from the resetting the boiler will automatically restart For an immedi...

Страница 23: ...he boiler will function by placing the selector on the o position obviously without consequent control of the room temperature The functioning instructions are inside the lid fig 9 Every setting or mo...

Страница 24: ...l lowing list of items one after the other are displayed The thermo feeler continues to function independently of the display Day hour room temperature External temperature Hot water service temperatu...

Страница 25: ...ity boiler unit temperature desired for hot water service at reduced level To have access to the reduced hot water service temperature parameter press the and keys at the same time for at least 5 seco...

Страница 26: ...rature set in parameter 3 1 standard Hot water according to the daily heating programme In the comfort periods of the heating the temperature of the boiler unit is regulated at the value set via para...

Страница 27: ...ode Current values Display and setting of the gradient of the heating characteristics curve When the room temperature set is not reached choose the gradient indicated in point 2 7 3 Display of the cur...

Страница 28: ...oning by acting on the filling tap of the boiler fig 4 Plant overpressure Call the Authorised Technical Service for assistance Thermostat safety interception Call the Authorised Technical Service for...