background image

105

4.5

CONVERSION 

TO ANOTHER GAS

For the functioning with propane gas (G31), a

kit  with  what  is  needed  for  the  conversion  is

supplied. 

To  convert  from  one  gas  to  another  follow

the instructions below (fig. 17):

–Close the gas tap

– Replace the main nozzles (6) supplied in kit,

the  aluminium  washer  ø  10  (5);  to  carry

out this operation use a ø 12 wrench.

–Remove the supply fitting of the pilot bur-

ner and substitute the nozzle (2).

–Insert  the  “GPL-MET”  bridge  of  the  con-

nector  of  the  electronic  panel  onto  the

“GPL” position (7 fig. 10).

– For  the  setting  of  the  values  of  the

maximum  gas  pressure  and  the  mini-

mum follow the indications as specified

in point 4.3. 

Once the operating pressure changes

have been carried out seal the regula-

tors.

–The  supply  pressure  mus t  never  be

greater than 50 mbar.

–Once  the  operations  have  been  finished

apply the label with gas pre-settings sup-

plied with the kit to the shell panel.

NOTE:  After  the  assembly  the  sealing

capacity  of  all  the  gas  connections  must

be  tested,  using  soapy  water  and  special

products,  and  avoiding  the  use  of  naked

flames.  The  conversion  must  be  carried

out only by authorised personnel.

4.6

DISASSEMBLY OF 

EXPANSION VESSEL

Before  disassembly  the  expansion  vessel,

empty the boiler of water. After the assem-

bly ensure that the expansion vessel is pre-

filled to a pressure of 1 bar.

4.7

CLEANING AND MAINTENANCE

Carry  out  the  cleaning  of  the  generator  in

the following way (fig. 18):

–Remove  the  electricity  supply  to  the  boi-

ler and close the gas supply tap.

–Dismantle the gas group completely.

–Dismantle the lid; clean the interstices of

the  boiler  structure,  going  from  the  top

to the bottom with an adequate brush.

– In cleaning the burners chemical products

or  steel  brushes  must  never  be  used.

Make sure that the top perforated part of

the burners is free of encrustations.

–During the assembly and disassembly of

t he  bur ner  it  is  r ecommended  t hat

attention  be  paid  to  the  star ting  and

detection  electrodes.  Reassemble  the

parts removed from the boiler, observing

the succession of the phases.

–Check the chimney making sure that the

smoke stack is clean.

–Check the functioning of the main burner.

–After  the  assembly  all  the  gas  connec-

25

20

15

10

10.000

15.000

20.000

POTENZA TERMICA kcal/h

PRESSIONE UGELLO mbar

30

35

5

25.000

30.000

22

32

15

14

13

12

11

10

9

8

7

6

5

10.000

15.000

20.000

POTENZA TERMICA kcal/h

PRESSIONE UGELLO mbar

25.000

30.000

22

32

Fig. 16

Diagram pressure/heat output for natural gas (methane)

Diagram pressure/heat output for propane gas (G31)

Fig. 16/a

Funzionamento corretto

Bruciatore

Funzionamento anomalo

7

1

2

3

4

5

6

Pretranci
da staccare

7

Fig. 17

NOZZLE PRESSURE (mbar)

NOZZLE PRESSURE (mbar)

HEAT OUTPUT kW (kcal/h)

HEAT OUTPUT kW (kcal/h)

KEY
1

Pilot burner

2

Pilot nozzle

3

Pilot supply tube

4

Burner collector

5

Aluminium washer ø 10

6

Main nozzle

7

Combustion chamber front panel

Correct operation

Anomalous operation

Burner

Содержание LOGO 22 OF

Страница 1: ...e boiler is set for operation for the type of gas supplied Check that the flue pipe for the outlet of the products of the combustion is unobstructed Make sure that any shutoff valves are open Make sur...

Страница 2: ...50 D H W tanks LOGO 32 50 OF 32 80 OF central heating and D H W production electronic ignition and modulation natu ral draught Follow the instructions given in this manual for the correct installation...

Страница 3: ...tank unit BT150 version CONNECTIONS M C H flow 3 4 M R C H return 3 4 M E D H W inlet 1 2 M G Gas connection 3 4 M U D H W outlet 1 2 M C Re circulation 1 2 F S1 Safety valve drain 1 2 F S2 D H W tank...

Страница 4: ...D H W circulating pump 10 C H circulating pump 11 Gas valve 12 Burners 13 Non return valve 14 Burners manifold 15 Water pressure transducer 16 Boiler drain cock 17 D H W expansion vessel 18 D H W safe...

Страница 5: ...40 80 40 80 40 80 40 80 D H W setting range C 10 60 10 60 10 60 10 60 Category II2H3P II2H3P II2H3P II2H3P Type B11BS B11BS B11BS B11BS Smokes temperature C 108 110 116 119 Smokes flow gr s 18 5 23 2...

Страница 6: ...W expansion vessel 5 Manual filling group 6 D H W tank 7 D H W tank drain cock 8 Boiler drain cock 9 Burners manifold 10 Pilot burner 11 C H circulating pump 12 Gas valve 13 Gas pressure switch 14 Saf...

Страница 7: ...connect up the boiler you are recommended to make the air cir culating in the piping in order to eliminate any foreign bodies that might be detrimen tal to the operating efficiency of the applian ce...

Страница 8: ...t this operation check that the filling tap is closed 2 5 FLUE The flue for the atmospherical expulsion of the combustion products from natural draught appliances must meet the following requirements...

Страница 9: ...nector ends 3 dama ges irreparably the control panel Before the connection make sure that there is no voltage 2 6 2 Logica Remote Control connection fig 6 pos B The electrical systems must be in com p...

Страница 10: ...on the inspection control and cleaning flange of the tank 2 6 5 Wiring diagram J7 J5 J4 J3 J2 KEY TR Transformer 230 24V TRA Ignition transformer P C H circulating pump PB D H W circulating pump EA I...

Страница 11: ...through a window contact Anti bacterial 2 7 1 Installation The unit must be installed in the main living room For installation follow the assembly instructions inserted in the package At this point w...

Страница 12: ...until it finds the optimum switch off time 59 60 SETTING THE HOT WATER SERVICE PARAMETERS Reduced hot water temperature value Hot water service filling The hot water may be set to a reduced temperatu...

Страница 13: ...witch over to reduced pre set value of the ambient temperature 3 With an external contact it is possible to switch over to reduced pre set value of the antifreeze ambient temperature short circuit 0 0...

Страница 14: ...eginning when the plant is cold and in the subsequent startings This is so to avoid ignitions and switching off with very short intervals that may in particular be found in plants with high losses At...

Страница 15: ...ntinuous jump spark from the electrode is noted despite the pilot burner being lit After 20 seconds the sparking stops the burner goes off and the block signal lights up The cable of the detector elec...

Страница 16: ...PERTURA TA 6 SB 11 SB 12 CIRCUITO CON VALVOLE DI ZONA NOTA I rel vengono impiegati solo nel caso le valvole di zona siano prive di micro L N TA TA1 VZ R VZ1 R1 NOTA PER VERSIONI SOLO RISCALDAMENTO Sos...

Страница 17: ...g potentiometer knob on the maximum value Using a 10 wrench turn the nut 3 to find the maximum pressure as shown in Table 2 to reduce the pressure turn the nut anti clockwise to increase the pres sure...

Страница 18: ...ENANCE Carry out the cleaning of the generator in the following way fig 18 Remove the electricity supply to the boi ler and close the gas supply tap Dismantle the gas group completely Dismantle the li...

Страница 19: ...erature always with the primary circuit controlled between 80 C and 70 C During the entire duration of the testing the hot water taps must remain open After verifying the combustion the boiler should...

Страница 20: ...C and the yellow led of the hot water will light up at the same time In the versions with storage capacity when there is no request for hot water service and heating the leds and are off the operatin...

Страница 21: ...ed Technical Service between April and September The boiler comes with an electricity supply cable which in case of replacement must be requested only from SIME FAULT FINDING Starting failure fig 3 If...

Страница 22: ...hts up To attempt to start the boiler again unscrew the cover of the thermostat and reset the button under neath After 10 minutes from the resetting the boiler will automatically restart For an immedi...

Страница 23: ...he boiler will function by placing the selector on the o position obviously without consequent control of the room temperature The functioning instructions are inside the lid fig 9 Every setting or mo...

Страница 24: ...l lowing list of items one after the other are displayed The thermo feeler continues to function independently of the display Day hour room temperature External temperature Hot water service temperatu...

Страница 25: ...ity boiler unit temperature desired for hot water service at reduced level To have access to the reduced hot water service temperature parameter press the and keys at the same time for at least 5 seco...

Страница 26: ...rature set in parameter 3 1 standard Hot water according to the daily heating programme In the comfort periods of the heating the temperature of the boiler unit is regulated at the value set via para...

Страница 27: ...ode Current values Display and setting of the gradient of the heating characteristics curve When the room temperature set is not reached choose the gradient indicated in point 2 7 3 Display of the cur...

Страница 28: ...oning by acting on the filling tap of the boiler fig 4 Plant overpressure Call the Authorised Technical Service for assistance Thermostat safety interception Call the Authorised Technical Service for...

Отзывы: