Nynja Operators Manual issue 2 (E) 1.2
13
4.4 Pre take-off checks (vital actions)
Prior to take-off, it is recommended that the following pre takeoff
check is used. Position the aircraft into wind, brakes held on
C - Controls
Check controls for full and free movement
Check visually that the controls are moving in the correct sense
H - Harness and Hatches
Check harnesses and hatches (doors) are secure, no loose objects
I – Instruments and engine
Check flight instruments are set and serviceable
Check engine instruments are serviceable, minimum operating temps
Check choke is OFF
Set 3000 RPM and check each ignition in turn – max RPM drop 150
Check for smooth idle around 1500-1700 RPM
Increase power to max brakes will hold for at least 10 seconds
Check engine indications normal. Reset RPM to 2000
F – Fuel and Flaps
Check fuel tap is ON
Check contents sufficient for flight
Cycle flaps and check symmetrical operation, detent operation
Set flap as required
T - Trim
Check trim set for takeoff (mid position)
W – Wind (and eventualities)
Check wind speed and direction / crosswind component
Consider emergency actions – abort point EFATO options etc
A – All clear
Confirm all clear on approach
R/T call if required and line up on runway
Содержание Skyranger Nynja 912UL
Страница 2: ...Nynja Operators Manual issue 2 E 1 2 2...
Страница 52: ...Nynja Operators Manual issue 2 E 1 2 52...
Страница 54: ...Nynja Operators Manual issue 2 E 1 2 54...
Страница 56: ...Nynja Operators Manual issue 2 E 1 2 56...
Страница 58: ...Nynja Operators Manual issue 2 E 1 2 58...
Страница 60: ...Nynja Operators Manual issue 2 E 1 2 60...