Pan
Tilt System
Users Manual, Rev. 1.0, May 2020
36
Figure 5-2: Cable Lead Through Wall Mount Bracket (left) and Wall Mount Bracket (right)
Open the hatch by undoing the screws as shown in the figure below. Insert the cables into the cable glands
holding the base at about 20 cm (7.9 in) from the support.
Figure 5-3: Hatch Opening
Use the power cable and the Ethernet network cable provided by the manufacturer. The Ethernet cable is already
fitted with a connector, so it is necessary to use the special seal provided.
Tightening torque: 2.7 Nm (23.9 lbf in)
Figure 5-4: Ethernet Cable Gland
Once you have positioned the gasket (01), fix the base (02) onto the bracket (03) with screws (04), serrated
washers (05) and screw rings (06). Use the screws and washers provided with the support.
Tightening torque: 6 Nm (53.1 lbf in)
50 cm
(19.7 in)
50 cm
(19.7 in)
Power Supply
Ethernet
Содержание Pan Tilt System
Страница 5: ......
Страница 21: ...Technical Data Dimensions 21 2 2 4 Dimensions Figure 2 2 Dimensions ...
Страница 32: ...Pan Tilt System Users Manual Rev 1 0 May 2020 32 Fully assembled camera ...
Страница 41: ...Pan Tilt Head Installation Fixing 41 5 Figure 5 10 Fixing of Upper Body and Base ...
Страница 56: ...Pan Tilt System Users Manual Rev 1 0 May 2020 56 ...
Страница 63: ...Appendix Field of View Calculator 63 10 ...