
PERFORMANCE VERIFICATION
Verify probe accuracy with the test setups shown in Figure 4.
Required test equipment is defined in Table 1. Toriod coil
construction is illustrated in Figure 5. First setup Connection A,
and makes the checks called for in Table 2. (Connect the output
of the probe directly to the signal-in on the phase meter for the
phase check.)
Then disconnect A at the 5100B, and set up Connection B. Make
the first four checks called for in Table 3. (Connect the probe
directly to the phase meter for the phase check.)
CAUTION
Remove the shunt before making the last check at
500A. Otherwise, the maximum current rating of the
shunt will be exceeded.
Table 1. Required Test Equipment
REQUIRED
RECOMMENDED MODEL
AC Calibrator
Fluke Model 5100B
Transconductance Amplifier
Fluke Model 5220A
Digital Multimeter (DMM)
Fluke Model 8050A
Phase Meter
Clarke-Hess Model 6000
0.05
Ω
, 2A, non-inductive shunt
Empro Model HA-2-100
Small insulated screwdriver
Spectral
Banana-to-BNC Adapter
Fluke Model PM9053
50-Turn Toriod Coil
(See Figure 5.)
8050A
5220A
50-TURN TOROID COIL
PHASE METER
OVERRANGE
UNDERRANGE
REFERENCE IN
10mV – 300mV
OVERRANGE
UNDERRANGE
REFERENCE IN
10mV – 300mV
MODEL 6000 PHASE METER
DEGREES
REMOTE
POWER
LOCAL
OFFSET
RANGE
ON
+/– 100
0 – 360
5100B DIRECT
0.05
Ω
0.25W
1%
SHUNT
5100B/5220A
A
5100B
B
Figure 4. Performance Test and Calibration Setup