2
Initial
Inspection
and
Storage
Instructions
2.1 Inspection and Recording
Upon receipt of the actuator, several steps should be initially followed to ensure condition of equipment and
to establish proper record keeping.
1. Carefully remove the actuator from the shipping carton or skid. Thoroughly examine for any physical
damage which may have occurred during shipment. If you note any damage, immediately report the
damage to the transport company.
2. A nameplate with important information is attached to each actuator. Record this information
for future reference.
2.2 Short-Term Storage (less than one year)
Actuators are not weatherproof until properly installed on the valve or prepared for storage.
Store actuators in a clean, dry, protected warehouse away from excessive vibration and rapid temperature
changes. If the actuators must be stored outside, they must be stored off the ground, high enough to prevent
them from being immersed in water or buried by snow.
1. Position the actuator in storage with motor and switch compartment horizontal.
2. Connect the internal heaters (if supplied) or place desiccant in the switch compartment.
3. Replace all plastic caps or plugs with taped or doped pipe plugs and ensure that all covers are tight.
4. If the actuator is mounted on a valve and the stem protrudes from the actuator, a suitable stem cover
must be provided.
5
Limitorque L120-85 Installation, Operation and Maintenance FCD LMENIM1202-03-A4 – 06/15
flowserve.com