LR, LRV, LLR and LR-S USER INSTRUCTIONS ENGLISH 71569088 08-10
Page 3 of 48
flowserve.com
INDEX
PAGE
Additional sources (10.3)......................................... 47
Alignment of shafting (4.3, 4.5 and 4.7)
Assembly (6.10)....................................................... 29
ATEX marking (1.6.4.2) ............................................. 7
CE marking and approvals (1.2)................................ 4
Certification (9) ........................................................ 47
Change notes (10.2)................................................ 47
Clearances (6.7, Renewal clearances).................... 26
Commissioning and operation (5)............................ 18
Compliance, ATEX (1.6.4.1)...................................... 6
Configurations (3.1) ................................................. 11
Consumable items (6.4) .......................................... 25
Copyright (1.4) ........................................................... 4
Design of major parts (3.3) ...................................... 11
Direction of rotation (5.3) ......................................... 20
Disassembly (6.8).................................................... 26
Disclaimer (1.3).......................................................... 4
Dismantling (6.8, Disassembly) ............................... 26
Drawings (8) ............................................................ 36
Duty conditions (1.5).................................................. 4
Electrical connections (4.8) ..................................... 17
End of product life (2.5) ........................................... 10
Examination of parts (6.9) ....................................... 28
Fastener torques (6.6) ............................................. 26
Faults; causes and remedies (7) ............................. 34
Forces and moments (4.6.3) ................................... 15
Foundation (4.3) ...................................................... 12
General arrangement drawing (8.6) ........................ 46
General assembly drawings (8)............................... 36
Grouting (4.4)........................................................... 13
Guarding (5.4).......................................................... 20
Handling (2.2) .......................................................... 10
Hydraulic, mechanical and electrical duty (5.9)....... 22
Inspection (6.2.1 and 6.2.2)..................................... 23
Installation (4) .......................................................... 12
Interchangeability charts (8.7) ................................. 46
Lifting (2.3)............................................................... 10
Location (4.1)........................................................... 12
Lubrication (5.1.1, 5.2 and 6.2.3)
Lubrication schedule (5.2.4) .................................... 19
Maintenance (6)....................................................... 22
Maintenance schedule (6.2) .................................... 23
Name nomenclature (3.2)........................................ 11
Nameplate (1.7.1) ...................................................... 8
Operating limits (3.4.1) ............................................ 12
Options (8) ............................................................... 36
Ordering spare parts (6.3.1) .................................... 25
Part assemblies (4.2)............................................... 12
Parts lists (8)............................................................ 36
Performance (3.4).................................................... 12
Piping (4.6) .............................................................. 14
PAGE
Pre-commissioning (5.1) ..........................................18
Priming and auxiliary supplies (5.5) .........................20
Protection systems (4.9) ..........................................17
Reassembly (6.10, Assembly) .................................29
Receipt and unpacking (2.1) ....................................10
Recommended fill quantities (see 3.4.2)..................12
Recommended grease lubricants (5.2.2).................19
Recommended oil lubricants (5.2.1) ........................19
Recommended spares (6.4).....................................25
Recycling (2.5) .........................................................10
Renewal clearances (6.7) ........................................26
Replacement parts (6.3 and 6.4)..............................25
Running the pump (5.7) ...........................................21
Safety action (1.6.3) ...................................................5
Safety labels (1.7.2) ...................................................8
Safety markings (1.6.1) ..............................................5
Safety, protection systems (1.6 and 4.9)
Sectional drawings (8)..............................................36
Sound pressure level (1.9, Noise level) .....................9
Sources, additional information (10.3) .....................47
Spare parts (6.3) ......................................................25
Specific machine performance (1.8) ..........................8
Starting the pump (5.6) ............................................20
Stop/start frequency (5.7.6)......................................22
Stopping and shutdown (5.8) ...................................22
Storage, pump (2.4) .................................................10
Storage, spare parts (6.3.2) .....................................25
Supplementary manuals or information sources......47
Supplementary User Instructions (10.1)...................47
Tools required (6.5)..................................................25
Torques for fasteners (6.6).......................................26
Trouble-shooting (see 7) ..........................................34
Vibration (5.7.5)........................................................21
Содержание 6LR-18A
Страница 18: ......
Страница 21: ......
Страница 22: ......
Страница 24: ......
Страница 52: ...GEI 56128 L Copyright 2016 General Electric Company 6 Figure 2A Mounting Figure 2B Mounting ...
Страница 63: ...GEI 56128 L Copyright 2016 General Electric Company 17 Typical 210 to 440 Frame Drip proof Construction ...
Страница 64: ...GEI 56128 L Copyright 2016 General Electric Company 18 Typical 140 to 440 Frame TEFC Construction ...