4、Wait for the extruder verifying distance between nozzle and plate on the second point and third point. If the distance
between nozzle and plate is not appropriate,operate according to the instruction on the touch screen.After verifying
completed,extruder moves to the third point,repeat the above steps to verify the distance as well. After finishing the
third point, leveling completed.
Note: If leveling failed tip shown up on the touch screen, please repeat the leveling operation according to
instructions until leveling finished.
14
Содержание Creator 3
Страница 60: ...59 10 移除X轴同步带和Y轴同步带上的卡扣 7 取出顶部配件及泡棉 8 移除固定打印机前门的胶带 9 取出内部的泡沫块 其中包含两个废料盒及两卷3D打印耗材 ...
Страница 62: ...61 2 2 硬件安装 废料盒安装 喷嘴刷安装 取出废料盒 将废料盒挂在打印平台两侧的挂钩上即可 左右两侧各一个废料盒 挂钩 挂钩 挂钩孔 取出喷嘴刷 套在喷嘴刷安装座上即可 左右两侧各一个喷嘴刷 ...
Страница 65: ...64 3 2 安装丝料 1 打开丝盘盖 2 取出耗材 将耗材插入进丝口中 进丝口 3 注意 为方便耗材转动顺畅 请按图中所示的方向安装耗材 安装左侧耗材时 请按逆时针方向出丝 安装右侧耗材时 请按顺时针方向出丝 ...
Страница 66: ...65 4 持续将耗材送入进丝口 直到耗材从导丝管穿出 5 按下喷头前方的进丝压板 将耗材垂直插入喷头 直到 无法继续插入 松开进丝压板 6 将导丝管插入喷头进丝孔中固定 7 最后将丝盘固定在丝盘架上 盖上丝盘盖 ...
Страница 99: ......
Страница 100: ...售后专线 support ff3dp com 服务热线 400 886 6023 官方网站 www sz3dp com 公司地址 浙江省金华市婺城区仙源路518号 ...