19
Installation steps
Figure 9
1.
Install 2
Φ50xΦ26
sleeves (#107) and
2Φ25
handle sleeves (#37) on right/left VKR arms
(#95/#96) respectively;
2.
Secure the right/left VKR arm (95#/96#) to the front column (#92) with 1 hex head bolt M12x70
(#125), 2 flat washers
Φ12
(#121) and 1 locknut M12 (#112);
3.
Install the 2 handle
Φ25x120
(#37) to one end of the
Φ25
handle pipe (#91) without the weld
nut.
4.
Install
Φ25
handle pipe (#91) on right/left VKR arm (#95)/(#96) with 2 hex head bolts M10x25
(#65) and 4 curved pads
Φ10
(#85).
5.
Install 2 VKR arm pads (#98) with 4 hex head bolts M8x65 (#110) and 4 curved pads
Φ8
(#113).
6.
Install the VKR arm connector (#102) on the right/left VKR arm (#95/#96) with four bevel head
hex bolts M8x12 (#105) and four flat pads
Φ8
(#55).
7.
Insert the ring pins
Φ10x70
(#106) into the front column #92).
Содержание MLD-M6
Страница 1: ... MLD M6 Fitness Equipment Co LTD ...
Страница 4: ...3 General Assembly Drawing MLD M6 Executed Standard GB17498 1 No Name Qty No Name Qty ...
Страница 7: ...6 108 40x100 elliptical flat pipe plug 2 ...
Страница 8: ...7 ...
Страница 9: ...8 ...
Страница 10: ...9 ...
Страница 30: ...29 ...