8
25% Cyan
0% Magenta
60% Yellow
0% Black
45% Cyan
0% Magenta
100%Yellow
0% Black
75% Cyan
0% Magenta
100%Yellow
0% Black
35% Black
HALF LOGO WIDTH
(A)
Product logo
(A)
(A)
(A)
ASSEMBLY INSTRUCTIONS
7
Install the Monitor / Handlebars:
Connect the wire of the monitor
(1) to the wire from the main
frame (5), making sure that the
two metal prongs are inserted
into the two connectors. Connect
the Front Handlebar (2) to the
Main frame (5) with Bolt & washer
located in Front Handlebar post.
8
Inflate the Gym ball (15) properly
using the hand pump provided.
Before inflating, remove the white
bung and insert once inflated.
FITERA BIKE IM - Final 0917.indd 8
27/09/2017 16:09:44