)LVKHU6FLHQWLILF
*UDYLW\&RQYHFWLRQDQG)RUFHG$LU,QFXEDWRUV
6
2SHUDWLRQ
3UHSDULQJWKH,QFXEDWRU
The incubator must not be released for operation before all major start-up activities have been
completed (see
chapter 5, “Start-up.”
).
'HYLFH&KHFN
Prior to starting operation, the following incubator components must be checked for their
correct function:
• The door seal in the front frame must not be damaged.
• The glass door must not be damaged.
• The shelving components must be installed safely.
• Disinfecting the Incubator’s Work Space.
Disinfect the work space according to the operator-specified hygiene guidelines.
6WDUWLQJ2SHUDWLRQ
1. Turn the incubator on using the control panel.
2. Adjust the temperature set value on the control panel.
3. The temperature controller starts adjusting the work space to the user-specified
temperature set value now.
7RDYRLGDQ\ULVNRIH[SORVLRQRUILUH
4. Load the work space with samples.
UHIUDLQIURPORDGLQJWKHLQFXEDWRUZLWKDQ\RIWKHVXEVWDQFHV
OLVWHGLQWKHVHFWLRQ
³,QFRUUHFW8VH´
RQ
SDJH
PDNHVXUHWKDWWKHDPELHQWDLULVIUHHRIDQ\VROYHQWV
GRQRWRSHUDWHWKHLQFXEDWRULQDUHDVZLWKDQH[SORVLRQKD]DUG
Содержание Isotemp 100L Incbtr Grvity 120V
Страница 1: ......
Страница 6: ... LVW RI LJXUHV LL UDYLW RQYHFWLRQ DQG RUFHG LU QFXEDWRUV LVKHU 6FLHQWLILF ...
Страница 32: ...3URGXFW HVFULSWLRQ 6KHOI 6 VWHP UDYLW RQYHFWLRQ DQG RUFHG LU QFXEDWRUV LVKHU 6FLHQWLILF ...
Страница 58: ...6KXW GRZQ 6KXWWLQJ WKH QFXEDWRU RZQ UDYLW RQYHFWLRQ DQG RUFHG LU QFXEDWRUV LVKHU 6FLHQWLILF ...
Страница 68: ...0DLQWHQDQFH 5HWXUQV IRU 5HSDLU UDYLW RQYHFWLRQ DQG RUFHG LU QFXEDWRUV LVKHU 6FLHQWLILF ...
Страница 74: ... UURU RGHV UDYLW RQYHFWLRQ DQG RUFHG LU QFXEDWRUV LVKHU 6FLHQWLILF ...
Страница 84: ... HYLFH RJ UDYLW RQYHFWLRQ DQG RUFHG LU QFXEDWRUV LVKHU 6FLHQWLILF ...
Страница 86: ... UDYLW RQYHFWLRQ DQG RUFHG LU QFXEDWRUV LVKHU 6FLHQWLILF ...