background image

3 | Installation and assembly

FISCHER Mess- und Regeltechnik GMBH

8/24

BA_EN_ME11

3 Installation and assembly

3.1 Generalities

The instrument may only be installed and commissioned by specialized person-
nel familiar with the installation, commissioning and operation of this product.

Specialized personnel are persons who can assess the work they have been
assigned and recognize potential dangers by virtue of their specialized training,
their skills and experience and their knowledge of the pertinent standards.

 WARNING

Mounting pressure transmitters

During assembly, observe the respective national and international guidelines
and safety regulations.

Only mount the unit to systems that are depressurized. Only ever operate the
unit within the permitted measuring range or below the maximum overload.

Fig. 5: 

Shutoff valve.

The device is set ex-works for vertical installation, however any installation posi-
tion is possible.

To guarantee safe working conditions during installation and maintenance, suit-
able stop valves must be fitted in the system (see accessories). By means of
the manometer shutoff, the unit

• Can be depressurized or taken out of operation.

• Be disconnected from the power supply within the applicable system for re-

pairs or inspections.

3.2 Process connection

• By authorized and qualified specialized personnel only.

• The pipes need to be depressurized when the instrument is being connec-

ted.

• Appropriate steps must be taken to protect the device from pressure surges.

• Check that the device is suitable for the medium being measured.

• Maximum pressures must be observed (cf. Tech. data)

 WARNING

Earth connection via the system earth

During assembly, ensure that the earth connection between the unit and the
system earth is ensured. The connection to the system earth is realised via the
process connection. Therefore, never use an insulated Teflon tape or similar.
Design the process connection acc. to EN 837 and use a suitable flat seal.

Содержание ME11 Series

Страница 1: ...Operating manual ME11 Pressure Transmitter 09005184 BA_EN_ME11 Rev ST4 B 04 22 09005184...

Страница 2: ...y other form print photocopy microfilm or another process without the written consent of the company FISCHER Mess und Regeltechnik GmbH Bad Salzuflen Reproduction for internal use is expressly allowed...

Страница 3: ...ctogram explanation 5 2 Product and functional description 6 2 1 Intended use 6 2 2 Product summary 6 2 3 Function diagram 7 2 4 Design and mode of operation 7 3 Installation and assembly 8 3 1 Genera...

Страница 4: ...s the work they have been assigned and recognize potential dangers by virtue of their specialized training their skills and experience and their knowledge of the pertinent standards 1 3 Risks due to N...

Страница 5: ...ompany is responsible for ensuring that all required mainten ance inspection and installation work is carried out by qualified specialized per sonnel 1 8 Pictogram explanation DANGER Type and source o...

Страница 6: ...essive media because the unit needs to be adapted for the specific customer in terms of the parts that come into contact with the media The device may only be used for the purpose stipulated by the ma...

Страница 7: ...suring range Electr Output Operating voltage Prod no Silicone free Fig 3 Nameplate 2 3 Function diagram Pressure p R R U I U b out 1 2 3 4 5 Fig 4 Function diagram 1 Ceramic sensor 2 electronics 3 Aux...

Страница 8: ...tion however any installation posi tion is possible To guarantee safe working conditions during installation and maintenance suit able stop valves must be fitted in the system see accessories By means...

Страница 9: ...ape U shape G ca 180 20 56 155 ca 200 G G ca 275 ca 130 20 56 G AF27 Manometer connection Connection spigot according to DIN EN 837 1 Fig 6 Siphon MZ1 The transmitter must be positioned below the meas...

Страница 10: ...1 Manometer connection Fig 8 Damping reactor MZ410 3 3 Electrical connections By authorized and qualified specialized personnel only When connecting the unit the national and international electro te...

Страница 11: ...w connection M16x1 5 Seal NBR Contact insert Housing Screw 1 2 3 Line socket Flanged connector Fig 11 Line socket DIN EN 175 301 803 A Ter minal Signal name DC Cable colour 1 Supply Output Ub Sig red...

Страница 12: ...utput Sig Black Table 4 3 wire connection 0 10V 3 4 Commissioning All electrical supply operating and measuring lines and the pressure connec tions must have been correctly installed before commission...

Страница 13: ...evices should be sent directly to our repair department Please coordinate all shipments with our sales department WARNING Process media residues Process media residues in and on dismantled devices can...

Страница 14: ...0 2500 kPa 100 bar 150 bar 0 40 bar 0 4000 kPa 100 bar 150 bar 0 60 bar 0 6000 kPa 200 bar 250 bar Vacuum and measuring ranges Measuring range Pressure safety SI unit Overpres sure Bursting pressure 1...

Страница 15: ...5 W VA 5 6 Operating conditions Ambient temperature range 0 C 60 C Storage temperature range 20 C 85 C Medium temperature range 0 C 85 C EMC EN 61326 1 2013 EN 61326 2 3 2013 RoHS EN 50581 2012 Type...

Страница 16: ...EN_ME11 5 7 Construction design 5 7 1 Standard casing dimensional drawing All dimensions in mm unless otherwise stated M12 x 1 72 38 5 28 SW27 91 20 3 G 6 17 5 13 2 5 G 9 5 20 18 NPT EXT SW27 Schrader...

Страница 17: ...th external thread 5 7 3 Electrical connections Fig 14 Line socket DIN EN 175 301 803 A Unit connector and cable socket DIN EN 175 301 803 Form A 4 pin 1 3 2 1 2 3 Line socket Device plug 1 2 2 Wire 3...

Страница 18: ...5 6 7 8 9 10 11 12 3 4 Code no Measurement accuracy 1 2 Measuring range 01 0 0 6bar 02 0 1bar 03 0 1 6 bar 04 0 2 5 bar 05 0 4bar 06 0 6bar 07 0 10bar 08 0 16bar 09 0 25bar 10 0 40bar 11 0 60bar 31 1...

Страница 19: ...B 4 20 mA DC 2 Wire 24V DC C 0 10 V DC 3 Conductor 24 V AC DC 7 Electrical connection H 4 pin standard plug DIN EN 175 301 803 A M 4 pin M12 plug connection DIN EN 61076 2 101 8 Operating voltage 9 24...

Страница 20: ...11 6 1 Prefabricated connection lines Order no Designation No of Poles length 06401993 PUR cable with M12 coupling 4 pin 2m 06401994 PUR cable with M12 coupling 4 pin 5m 06401563 PUR cable with M12 co...

Страница 21: ...FISCHER Mess und Regeltechnik GMBH Attachments 7 BA_EN_ME11 21 24 7 Attachments Fig 16 CE_EN_ME11...

Страница 22: ...7 Attachments FISCHER Mess und Regeltechnik GMBH 22 24 BA_EN_ME11 Fig 17 UKCA_EN_ME11...

Страница 23: ...FISCHER Mess und Regeltechnik GMBH BA_EN_ME11 23 24 Notes...

Страница 24: ...lefelder Str 37a D 32107 Bad Salzuflen Tel 49 5222 974 0 Fax 49 5222 7170 www fischermesstechnik de info fischermesstechnik de Technische nderungen vorbehalten Subject to technical changes Sous r serv...

Отзывы: