3 | Installation and assembly
FISCHER Mess- und Regeltechnik GMBH
12/24
BA_EN_ME11
3.3.2 M12 flanged connector DIN EN 61076-2-101
Coding A
1
4
3
2
1
4
3
2
Flanged
connector
Line socket
Fig. 12:
M12 plug DIN EN 61076-2-101
Pin
Signal name
DC
Cable colour
1
Supply /Output
+U
b
+Sig brown
2
n.c.
3
Supply /Output
-U
b
-Sig
blue
4
n.c.
Table 3:
2-wire connection 4 ... 20 mA
Pin
Signal name
AC
DC
Cable colour
1
Supply
~U
b
+U
b
brown
2
n.c.
3
Supply /Output
~U
b
-U
b
-Sig
blue
4
Output
+Sig Black
Table 4:
3-wire connection 0 ... 10V
3.4 Commissioning
All electrical supply, operating and measuring lines and the pressure connec-
tions must have been correctly installed before commissioning. All supply lines
are arranged so that there are no mechanical forces acting on the device.
• If liquid measuring media are used the pressure connection lines must be
vented, as liquid columns of different heights in the pipes can cause meas-
uring errors. The instrument must be protected against frost, if water is used
as a measuring medium.
• Appropriate shutoff valves must be provided to ensure safety during installa-
tion, maintenance and inspection
Содержание ME11 Series
Страница 1: ...Operating manual ME11 Pressure Transmitter 09005184 BA_EN_ME11 Rev ST4 B 04 22 09005184...
Страница 21: ...FISCHER Mess und Regeltechnik GMBH Attachments 7 BA_EN_ME11 21 24 7 Attachments Fig 16 CE_EN_ME11...
Страница 22: ...7 Attachments FISCHER Mess und Regeltechnik GMBH 22 24 BA_EN_ME11 Fig 17 UKCA_EN_ME11...
Страница 23: ...FISCHER Mess und Regeltechnik GMBH BA_EN_ME11 23 24 Notes...