Installation Instructions
Page 62 Panda PMS AGT-DC 4000 - Chapter D: Installation Instructions
D.8 Generator DC System-Installation
ATTENTION! Before the electrical system is installed, READ the “Safety Instructions” on
Page iv of this manual FIRST! Be sure that all electrical installations (including all safety
systems) comply with all required regulations of the regional authorities. This includes
lightnening conductor, personal protection switch etc.
D.8.1 Installation Panda AGT 12V-sytem
All electrical safety installations have to be made on board.
1
2
5
6
3
4
7
7
8
1. Generator
2. Battery bank 12V
3. Battery monitor
4. Fuel pump
5. Remote control panel
6. Voltage control VCS
7. Fuse
8. Battery switch