Generator operation instruction
10.6.16
Kapitel/Chapter 6: Generator operation instruction - Seite/Page 99
6.3.4 Protection conductor:
The standard Panda generator is grounded. The 3-phase connection (delta) centre point is bridged to earth in the
AC output terminal box (mounted on the generator). This is the initial earth safety point and is sufficient to ensure
safe operation however only as long as no other system is installed. This system is adapted to enable test running of
the generator before delivery.
The bridge to ground (PEN) is only effective when all components in the electrical system share a common ground.
The bridge to ground can be removed and reconnected to another ground system if required for other safety stan-
dards.
Full voltage connections are mounted in the electrical cabinet. It must be ensured that the electrical cabinet is secu-
red and closed while the generator is running.
The starter battery cable should be disconnected when work is being done on either the generator or the electrical
system in order to prevent accidental starting of the generator.
6.3.5 Operating control system on the Fischer Panda generator
Fischer Panda generators are equipped with various sensors/temperatures switches. The combustion engine is
further equipped with a oil pressure control switch, which switches the motor off, if the oil pressure sinks to a particu-
lar level.
6.4
Instructions for capacitors - not present at all models
CAUTION!
Danger to Life - High voltage
Do not touch the capacitor contact terminals!
The generator's electrical system requires two different groups of capacitors:
A) The booster capacitors
B) The operating capacitors
Both types are mounted in the electrical cabinet. (At some models direct on the generator)
Capacitors store an electrical charge. It is possible that even after they have been disconnected stored energy is still
held. Therefore it is essential that the connectors are not touched.
Should it be necessary to check or test the capacitors, they should be shorted out by using an insulated screw driver.
The operating capacitors are automatically discharged when the generator is stopped in the normal way. The boo-
ster capacitors will be discharged through internal resistors.
For safety however, the capacitors have to be discharged (short circuited) prior to carrying out any work on the AC-
Control box.
6.5
Checks before start, starting and stopping the generator
see remote control panel data sheet/manual
Note:
The instructions and regulations of the remote control
panel data sheet/manual must be respected.
Respect the safety instruction in front of this manual.
Содержание 10000x
Страница 10: ...Seite Page 10 Kapitel Chapter 2 10 6 16 Leere Seite Intentionally blank...
Страница 46: ...Seite Page 46 Kapitel Chapter 4 The Panda Generator 10 6 16 Leere Seite Intentionally blank The Panda Generator...
Страница 96: ...Installation Instructions Seite Page 96 Kaptitel Chapter 5 Installation Instructions 10 6 16...
Страница 124: ...Generator Failure Seite Page 124 Kaptitel Chapter 8 Generator Failure 10 6 16 Fig 8 6 5 4 Wiring diagram HP3 400 V 50 Hz...
Страница 148: ...Seite Page 148 Kapitel Chapter 9 Appendix 10 6 16 Leere Seite Intentionally blank Appendix...
Страница 149: ...Panda_xControl_eng R01 5 10 6 16 Panda xControl Manual...
Страница 189: ...Panda xControl 10 6 16 Kapitel Chapter 11 Panda xControl Seite Page 189...
Страница 190: ...Seite Page 190 Kapitel Chapter 11 Panda xControl 10 6 16 Leere Seite Intentionally blank Panda xControl...