Basics
10.6.16
Kapitel/Chapter 3: Basics - Seite/Page 31
Fig. 3.7.2-1: Lifting yoke (example)
An adequate lifting yoke shall be used for transport/
loading.
3.8
Special service instructions and measures for extended machine
downtimes and decommissioning
Note:
The decommissioning and storage must be undertaken and
proved regarding the operation and storage situation.
Fischer Panda takes no responsibilty for damages
through wrong decommissioning and storage.
Downtimes are categorised in the following groups:
• Short downtime (1 to 3 months)
• Medium term downtime / hibernation (3 to 6 months)
• Extended downtime / decommissioning (more than 6 months)
3.8.1 Instructions for the starter battery for extended downtimes
Note: Information starter battery
Starter batteries
Self-discharge of batteries is a physical and chemical
process and cannot be avoided even if the battery is
disconnected
• For extended downtimes, the battery shall be disconnected from the genset.
• Charge battery regularly. Observe instructions of the battery manufacturer.
Depending on the battery type, check the acid level before charging and refill each cell up to the marking using
distilled water as necessary.
Modern starter batteries are typically maintenance-free.
Deep discharge will damage the battery and can render it unusable.
Keep battery clean and dry. Clean battery poles (+ and -) and terminals regularly and coat with acid-free and acid-
resistant grease. During assembly, ensure good contact of the terminal connections.
General limits for lead-acid batteries:
2.1 V / cell corresponds with full battery (charged).
1.95 V / cell corresponds with empty battery - recharge.
For a 12 V battery, the following applies:
Содержание 10000x
Страница 10: ...Seite Page 10 Kapitel Chapter 2 10 6 16 Leere Seite Intentionally blank...
Страница 46: ...Seite Page 46 Kapitel Chapter 4 The Panda Generator 10 6 16 Leere Seite Intentionally blank The Panda Generator...
Страница 96: ...Installation Instructions Seite Page 96 Kaptitel Chapter 5 Installation Instructions 10 6 16...
Страница 124: ...Generator Failure Seite Page 124 Kaptitel Chapter 8 Generator Failure 10 6 16 Fig 8 6 5 4 Wiring diagram HP3 400 V 50 Hz...
Страница 148: ...Seite Page 148 Kapitel Chapter 9 Appendix 10 6 16 Leere Seite Intentionally blank Appendix...
Страница 149: ...Panda_xControl_eng R01 5 10 6 16 Panda xControl Manual...
Страница 189: ...Panda xControl 10 6 16 Kapitel Chapter 11 Panda xControl Seite Page 189...
Страница 190: ...Seite Page 190 Kapitel Chapter 11 Panda xControl 10 6 16 Leere Seite Intentionally blank Panda xControl...