Installation Instructions
9.12.14
Kapitel/Chapter 7: Installation Instructions - Seite/Page 89
7.9.2 The Electrical Fuel Pump
Fig. 7.9.2-1: Electrical Fuel Pump
Electrical fuel pump
With the Panda generator is usually supplied an external,
electrical fuel pump (DC). The fuel pump must be installed
close at the fuel tank. The electrical connections are pre-
loaded at the generator with the lead planned.
Suction height of the pump: max. 1,2 m at 02, bar
Diameter of fuel lines: section 11.10, “Diameter of conduits,”
on page 219.
7.9.3 Connection of the fuel lines at the tank
Lead the return fuel pipe connected to the day tank to the floor
The return pipe connected to the tank must be dropped to the same depth as the suction pipe, if the generator is
mounted higher than the tank, in order to prevent fuel running back into the tank after the motor has been switched
off, which can lead to enormous problems, if the generator is switched off for a long period.
Non-return valve in the suction pipe
A non-return valve must be fitted to the suction pipe, which prevents the fuel flowing back after the generator has
been switched off, if it is not possible to use the return flow pipe as a submerge pipe placed in the tank. The
instructions „Bleeding Air from the Fuel System“ must be read after initial operation or after it has stood still for a long
period, in order to preserve the starter battery.
ATTENTION!
Non-return valve for the fuel return pipe
If the fuel tank should be installed over the level of the
generator (e.g. daily tank), then a non-return valve must
be installed into the fuel return pipe to guarantee that
through the return pipe no fuel is led into the injection
pump.
Содержание 10000/9
Страница 10: ...Seite Page 10 Kapitel Chapter 2 9 12 14 Leere Seite Intentionally blank...
Страница 62: ...The Panda Generator Seite Page 62 Kaptitel Chapter 6 The Panda Generator 9 12 14...
Страница 220: ...Tables Seite Page 220 Kaptitel Chapter 11 Tables 9 12 14...
Страница 244: ...Seite Page 244 Kapitel Chapter 13 General operation 9 12 14 Leere Seite Intentionally blank General operation...
Страница 246: ...Seite Page 246 Kapitel Chapter 14 Measurements 9 12 14 Leere Seite Intentionally blank Measurements...