background image

14 

 

 

 

 

filter 

 

 

 

PROBLEM 

CAUSES 

SOLUTIONS 

Loss of media 

 to drain 

A)   Air in system 
B)  Insufficient soak 

time before first 
backwash  after 
installing media 

1)  Ensure well system has proper air 

elimination control 

2)  Check media level and adjust if 

necessary 

Media in service lines 

A)  Unit is installed 

backwards 

B)  Distributor basket 

is broken 

C)  Insufficient gravel 

under bed 

1)  Re-plumb the water lines so that the 

supply side of the line is connected to 
the inlet of the bypass and the service 
side is connected to the outlet. 

2)  Replace distributor. 
3)  Add gravel to tank, manually 

backwash 

Howling or whistling noise 

during regeneration 

A)  Inadequate drain 

line diameter or 
drain line restricted 

1)  Reconfigure or replace drain line 

Continuous flow of water 

to drain 

A)   Loss of electrical 

power during 
regeneration 

B)  Debris in control 

valve 

C)  Internal leak in 

control valve 

1)  Ensure electrical outlet is functioning 
2)  Disassemble and clean control valve 
3)  Replace seals and/or piston 

Filter backwashes  at 
wrong time of day 

A)  Clock is not set 

properly 

B)  Power outage 
C)  Incorrect control                             

valve programming 

1)  Reset  the clock (page 8) 
2)  Verify control valve programming 

(page 8) 

Display is blank 

A)  Control valve circuit 

board needs reset 

B)  Transformer is 

unpowered, 
unplugged or 
defective 

C)  Defective circuit 

board 

1) 

Hold “NEXT” and “REGEN” buttons 
for 3 seconds 

2)  Short leftmost 2 pins of connector J10 

on control valve circuit board for 3 
seconds 

3)  Verify transformer is plugged into an 

electrical outlet that has power and 
transformer cable (black, 4 pins) is 
plugged into control valve connector 
J4 (labeled “12VAC PWR”) 

4)  With transformer plugged into 

electrical outlet, use a volt meter to 
test the 2 outer pins (furthest left and 
furthest right) of connector J4 on  the 
control valve circuit board.  Should be 
approximately 12 volts AC.  Replace 
transformer if defective. 

5)  Replace circuit board if needed 

Troubleshooting (cont.) 

 

Содержание IBW10-1

Страница 1: ...s LLC 12630 US Highway 33 N Churubusco IN 46723 Phone 260 693 1972 Fax 260 693 0602 IBW IMBW Instruction Manual 170605 docx IBW IMBW Series Backwashing Filter System Installation Instructions and Owne...

Страница 2: ...tions Page 6 Operating Displays Page 10 Maintenance Page 11 Troubleshooting Guide Page 13 Specifications Page 16 Component Parts Breakdown Page 17 Component Parts List Page 18 Control Valve Breakdown...

Страница 3: ...ALIZER 0 50 PAIL 45 FA10 FILTER AG SUSPENDED SOLIDS REDUCTION 1 00 BAG 24 FA05P 0 50 PAIL 12 N05 NEUTRALIZER ACID NEUTRALIZER 0 50 PAIL 43 QFS05P QUARTZ FILTER SAND 0 50 PAIL 51 45mm x 55mm SEDIMENT R...

Страница 4: ...f this system 1 The IBW IMBW must be installed after the pressure tank private well system only 2 The system should be installed as close as possible preferably within 15 to an adequate floor or laund...

Страница 5: ...ed If necessary pliers can be used to unscrew the nut or cap Do not use a pipe wrench to tighten nuts or caps Do not place screwdriver in slots on caps and or tap with a hammer NOTE If the plumbing sy...

Страница 6: ...regeneration cycle this position provides regeneration water to the unit while also providing untreated water to the distribution system Fig 2 2 Bypass Position The inlet and outlet handles point to...

Страница 7: ...rivate well system turn off power to pump and drain pressure tank Make certain pressure is relieved from complete system by opening nearest faucet to drain system SHUT OFF FUEL ELECTRICAL SUPPLY TO WA...

Страница 8: ...There must be an air gap at the end of the drain line to prevent siphoning of waste water AVOID OVERHEAD DRAINS AND DRAIN LINE LONGER THAN 15 STEP 10 MAKE SURE THE BYPASS VALVE IS IN THE BYPASS POSIT...

Страница 9: ...y will show SET b The lower left of the display will show REGEN above and DAY below c A number will flash default 3 2 Using the UP or DOWN triangle pointing up or down buttons set the number of days d...

Страница 10: ...pass valve counter clockwise until it is fully in the Service position Figure 2 Page 5 and leave the control valve in Backwash position for at least 10 minutes or until water flowing from the drain li...

Страница 11: ...and will reset itself to provide treated water when the regeneration has been completed 3 Manual Regeneration Sometimes there is a need to regenerate before the control valve calls for it This may be...

Страница 12: ...e from the electrical outlet to prevent it from advancing automatically 3 Disconnect the Control Valve from the Bypass Valve 4 Disconnect the Drain Line from the Control Valve 5 Unscrew Control Valve...

Страница 13: ...ce the air is purged gradually turn the INLET knob of the bypass valve counter clockwise until it is fully in Service position Figure 2 Page 5 Then turn the OUTLET knob of the bypass valve counter clo...

Страница 14: ...butor tube not seated properly in control valve D Water usage flow rate exceeds filter specifications 1 Verify bypass valve is in service position 2 Replace piston and seal assemblies 3 Verify distrib...

Страница 15: ...trol valve 1 Ensure electrical outlet is functioning 2 Disassemble and clean control valve 3 Replace seals and or piston Filter backwashes at wrong time of day A Clock is not set properly B Power outa...

Страница 16: ...oken wires verify motor plugged into connector J1 labeled MOTOR on control valve circuit board and reset control valve hold NEXT and REGEN buttons for 3 seconds 2 Remove piston and seal assemblies for...

Страница 17: ...area 3 3 4 5 Peak 18 gpm ft 2 of media surface area 10 10 14 17 Backwash 10 gpm ft 2 of media surface area NOTE some medias may require a higher backwash rate 5 3 5 3 7 5 9 Service Pipe Size in Standa...

Страница 18: ...17 3 1 4 5 6 2 Component Parts Breakdown...

Страница 19: ...butor Tube 1 x 54 for model IBW15 IBW25 IMBW15 IMBW25 4 MTP1044N 10 x 44 Mineral Tank Nat Base 2 5 Top Opening For model IBW10 IMBW10 MTP1054N 10 x 54 Mineral Tank Nat Base 2 5 Top Opening For model I...

Страница 20: ...19 Control Valve Breakdown...

Страница 21: ...215 12 CV3177 01 Injector Screen 13 CV3010 1Z Plug Injector Assembly 15 CV3150 Retainer Split Ring 16 CV3151 Nut 1 Quick Connect 17 CH4615 Clip Elbow Locking 18 CV3163 O ring 019 19 CV3165 01 Retainer...

Страница 22: ...plit ring 2 3 CV3105 O ring 215 2 3 CV3105 O ring 215 2 4 CV3149 Fitting 2 4 CV3189 Fitting 2 1 BRASS SWEAT 3 4 BRASS SWEAT Ref Part Description Qty Ref Part Description Qty CV3007 02 1 brass sweat as...

Страница 23: ...ck connect 2 1 CV3151 Nut 1 quick connect 2 2 CV3150 Split ring 2 2 CV3150 Split ring 2 3 CV3105 O ring 215 2 3 CV3105 O ring 215 2 4 CV3628 Fitting 2 4 CV3629 Fitting 2 1 1 4 PLASTIC MALE NPT Ref Par...

Страница 24: ...4 QUICK CONNECT 1 2 required SERVICE WRENCH CV3193 Although no tools are necessary to assemble or disassemble the valve the Service Wrench shown in various positions on the valve is available to aid i...

Страница 25: ...24...

Отзывы: