20
Maintenance
Item
Time Frame
Instructions
Notes
Seat Wheels and
Rail
Weekly
Wipe down Seat Rail and Seat wheels
with lint free cloth.
Frame
Weekly
Wipe down Frame with lint free cloth.
Tank and Water
Treatment
12 months to 2
years
Follow instructions as specified in
the “Water Treatment” section of
this manual.
Bungee Cord
Check every
hundred hours for
correct tension
and for signs of
wear.
The Bungee Cord should last for
many years. If a Bungee Cord change
is required, please contact your local
service representative or go online at
www.firstdegreefitness.com for
Rowing Belt
Check every
hundred hours for
correct tension
and for signs of
wear.
The Rowing Belt should provide many
years of trouble free use. If a rowing
belt change is required, please
representative or go online at
www.firstdegreefitness.com for
All preventive maintenance activities must be performed on a regular basis. Performing
routine preventive maintenance actions can aid in providing safe, trouble-free operation
of all FIRST DEGREE FITNESS equipment.
FIRST DEGREE FITNESS is not responsible for performing regular inspection and
maintenance actions for your machines. Instruct all personnel in equipment inspection
and maintenance actions and also in accident reporting and recording.