8
SECTION C:
INFORMATION REGARDING MAINTENANCE
C.1 MAINTENANCE
1.
ORDINARY: Includes:
•
Daily cleaning
•
Checking the belt tension ( monthly)
See chapter C.2 for operative methods.
•
Checking the correct functioning of commands and safety devices
(every time it is turned on).
C.2 ADJUSTING BELT TENSION FOR SPIRAL ROTATION
The belt tension must be adjusted if, during a work cycle, the operator notices
a slowing down in the rotation of the spiral tool.
1.
Remove the three side screws
V
which secure the head guard
T
.
2.
Lift the head guard
T
and disconnect the connector
E
.
3.
Loosen the 4 screws
A
which secure the motor support plate (without
completely unscrewing them).
4.
If necessary replace the belts:
•
Loosen the two nuts
B
•
Tighten the two nuts
C
(in order to loosen the belts) and remove
them.
2.
EXTRAORDINARY
This can be considered a
preventive operation
as well as an intervention
in the event of
malfunctions and/or breakages
.
These operations must be carried out by personnel
authorised by the
manufacturer
or by one of his direct resellers. In the event that the user
has specially trained personnel at his disposal, once the warranty has
expired, he can request the manufacturer provide him with more detailed
drawings and lists, as well as exploded views of the mechanical parts. In
this case the user
is responsible for any damage
caused to persons and/or
the machine.
After 2000 working hours: it is advisable to have a technician inspect the
bearings and the other transmission parts.
5.
If necessary adjust the belt tension:
•
To increase the tension
:
Loosen the two nuts
C
.
Tighten the two nuts
B
.
•
To decrease the tension:
Loosen the two nuts
B
.
Tighten the two nuts
C
.
C.2.1 ADJUSTMENT FOR MOD. M40 – M60
T1
T
V
E
C
C
B
B
A
A
Содержание ESCHER M40
Страница 17: ...17...
Страница 19: ...19...
Страница 22: ...22 Table 4 Machine structure exploded view...
Страница 23: ...23 11 10 14 12 9 1 2 3 4 5 6 7 8 11 10 13 15 16 19 13 14 17 18 17 20 21 22 21 20 23...
Страница 25: ...25...