FIREPLACE INSTALLATION
STEP 3: FIREBOX ASSEMBLY (CONTINUED)
BACK WALL AND SIDE BLOCKS
Side blocks and back blocks are next. Completely cover
each component with mortar 1/2” - 1” thick where it will lie
or butt up against another component. You will begin by
placing a back block on the base plate (Figure 6.4). Next,
place the corresponding side blocks (Figure 6.5), again
completely covering each edge of a component that butts
up to another component (including the base plate) with
1/2” - 1” of mortar. Use your level to ensure level and plumb
placement of each component.
Continue to build each course of the firebox, making sure
all surfaces are plumb and level and firebox position is
correct (Figure 6.6).
Butter all joints inside and out (see page 15).
LEVELING AND ALIGNING COMPONENTS
It is important that each course of the firebox is level
and flush with adjoining components
. FireRock mortar
is not intended to create a mortar joint of any thickness
for leveling purposes. Leveling and alignment adjustments
should be made by the use of small shims. Be sure to re-
mortar any gaps resulting from the shims to maintain a
leak-free seal.
FIGURE 6.5
1 COURSE
FIGURE 6.4
BASE PLATE + 1 BACK BLOCK
FIGURE 6.6
FULLY ASSEMBLED FIREBOX
Содержание FIREROCK RUMFORD
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 39: ...39 FIREPLACE PARTS CONTINUED CHIMNEY BLOCK SIDE ELEVATION PLAN ISOMETRIC...
Страница 40: ...40 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 46: ...46 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 47: ...47 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 48: ...Version 2 1 10 2019...