Finalizing the Installation
(for qualified installers only)
7
© Travis Industries
4/23/2021 - 1552
564 GSR2 35K CF
Packing List
Propane Conversion Kit (Front #58 Orifice, Rear #C55 Orifice, Pilot Orifice 0.14 LP).
2 Piece Firestop (sku# 250-05641)
Remote
Embers, Rockwool, Ember-Glass
Pipe shield (attached to the top of the fireplace)
Additional Items Required
Log Set
Vent Pipe (installation specific)
Gas Line Equipment (shutoff valve, pipe, etc.)
Electrical Equipment (min. 14 gauge, grounded line)
Installation Overview
All requirements below must be met.
Recommended Installation Procedure
Frame the opening for the fireplace. Make sure to allow for vent installation.
This fireplace is designed to accommodate 1/2" (13mm) or 5/8" (16mm) drywall (see "Nailing
Brackets" on page 13 for details). Secure the fireplace to the framing.
Install the vent, gas line, and electrical hook-up.
Install the drywall.
Install the hearth (if applicable).
Install the facing (if applicable).
Install the mantel (if applicable).
Install the firebacks (optional)
Install the media
Finalize the installation (see page 36) and install the grill or face.
See the section
"Electrical Connection"
See the section
"Mantel Requirements"
Insulation must not fill
the 1/2" (13mm)
clearance around the
back and sides of the
fireplace.
See the section "Minimum
Framing Dimensions"
Drywall
Top Vent
Configuration
See the section
"Gas Line Installation"
Side
Wall
See the section
See the section
"Approved Vent
"Pipe Shield Installation”
Configurations"
See the section
"Vent Requirements"
See "Optional Non-
Combustible Facing"
Drywall
See "Optional Non-
Combustible Hearth"
Nailing Brackets
1" Min.
25mm