provide periodic maintenance in accordance with
local laws.
For the maintenance of other devices such as
detectors and modules, follow the dedicated
instructions for the devices.
Users must carry out the following operations
regularly:
•
Use a damp cloth to remove dust from the
control panel cabinet. Do not use solvents of
any kind.
•
Using the
Lamp Test
key, check that the LEDs
and buzzers function properly.
The following operations must be carried out
regularly by qualified persons only:
•
Ensure that the batteries are sufficiently
charged and functioning properly. If not,
replace them immediately.
•
Ensure that all cables and connections are
intact.
•
Ensure that there are no unrelated objects
inside the control panel case.
•
Ensure that the control panel can process a
fire alarm and operate the regular sounders
and outputs subsequent to a fire alarm
incident. If there is a facility for transmitting
fire alarm signals to a central station, ensure
that signal comes through correctly.
Verifying the functionality of the
circuit
The purpose of verifying the circuit's functionality is
to ensure the circuit can detect faults.
1. Connect one of the loops’ SH terminals to the
ground.
2. Verify that the fire panel correctly reports the
fault
3. Remove any connection points previously
made.
Figure 18: Control panel and 38Ah Batteries metal box connection (accessory item)
FC503 and FC506 Addressable Fire Control Panels
34