![Fimap Magna 1300 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/fimap/magna-1300/magna-1300_operating-instructions-manual_2288983008.webp)
MACHINE PREPARATION
3. INSTALLATION OF THE BATTERIES INTO THE MACHINE
The batteries are fitted in the appropriate compartment under the seat and
must be handled by using appropriate lifting equipment suitable both for the
weight and for the coupler system.
They must moreover satisfy the requirements quoted in the Specification CEI
21-5.
For maintenance and daily recharge of the batteries, it is necessary to follow
strictly all the indications given from the constructor or from his dealer .
All the installation and maintenance operations must be carried out by
specialized staff.
For the battery installation:
1.
Lift the base support of the seat
2.
Lift the battery cover (1 fig.3) and if necessary, take it off
3.
Take off the left side panel (2 fig.3)
4.
Put the batteries into its position according to the instructions indicated in
“BATTERIES”
5.
Place the panel fixing in position again (2)
6.
Lower the base support of the seat
7.
Place the fixing of the battery cover in position again, if it has been taken
off (1)
4. CONNECTION OF THE BATTERY CONNECTOR
The battery connector (1) is placed in the left lower part of the operator and
must be connected to the connector (2) of the machine.
40