![Filtec Omnivision 1000 Series Скачать руководство пользователя страница 58](http://html1.mh-extra.com/html/filtec/omnivision-1000-series/omnivision-1000-series_upgrade-installation-manual_2288790058.webp)
50
Omnivision Upgrade
Installation Manual
Document 45277-0805
Testing CB1 Circuit.
1.
Turn CB1 ON.
2.
Verify that the voltage at CB2, CB3, CB4, CB5 and CB6 is 120
VAC.
Testing CB2 Circuit.
1.
Locate the following connector and insure it is not connected:
• PD2-P1 (AC into PD)
2.
Turn on CB2
3.
Check PD2-P1 for 120 VAC.
4.
Turn off CB2
5.
Locate the following connector and insure they are not
connected to their respective power supplies:
• PS5-P1 (+5V Supply)
• PS4-P1 (+12V Supply)
• PS1-P1 (+48V Supply)
6.
Turn CB2 ON.
7.
Verify the voltage at following connector are at 120 VAC
• PS5-P1 (+5V Supply)
• PS4-P1 (+12V Supply)
• PS1-P1 (+48V Supply)
8.
Turn CB2 OFF and reconnect the connectors.
9.
Locate the following connectors:
• PS5-P2 (+5V supply)
• PS4-P2 (+12V supply)
• PS1-P2 (+48V supply Starwheel)
• PS2-P2 (+48V supply)
• PS3-P1 (Fan 24VDC P.S)
• Turn CB2 ON.
10.
Record the voltage at PS1-P2 and PS2-P2 should be +48VDC.
Содержание Omnivision 1000 Series
Страница 1: ...Omnivision Upgrade Installation Manual Document 45277 0805...
Страница 3: ...2 Document 45277 0805...
Страница 4: ...3 Omnivision Upgrade Installation Manual Document 45277 0805...
Страница 8: ...4 Omnivision Upgrade Installation Manual Document 00805...
Страница 15: ...Machine Preparation 7 Document 45277 0805 Echain...
Страница 17: ...Machine Preparation 9 Document 45277 0805 Red Harness Yellow Column White Column BLUE COLUMN Plate 2 Location...
Страница 62: ...54 Omnivision Upgrade Installation Manual Document 45277 0805 5 Measure XFMR2 P1 for 220VAC 6 Turn Off CB12...
Страница 70: ...62 Omnivision Upgrade Installation Manual Document 45277 0805...