![Filtec Omnivision 1000 Series Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/filtec/omnivision-1000-series/omnivision-1000-series_upgrade-installation-manual_2288790012.webp)
4
Omnivision Upgrade
Installation Manual
Document 45277-0805
The base cabinet is prepared and the AC Distribution panel is
installed.
Day 2 - AC Power wiring/Cable harness installation
All power wires are routed through the Base Cabinet and routed
up to the upper cabinet. The upper power supply plate is
installed and the ac cables are routed to all supplies.
The cable harnesses are installed in their respective columns.
Cable routing commences in the upper and lower cabinets.
Day 3 - Completion of Cable harness wiring
The electronic chassis is installed and all cable routing and
connections are finalized in the upper and lower cabinets.
The power supplies are checked for correct connections and
voltages.
The machine is powered up/booted and basic functions are
checked. Initial bottle setups are statically tuned for each bottle
type.
Day 4- Finalization and Commissioning
Final static preparations for production bottle flow are made for
bottle type to run that day. Final tuning and adjustments
performed during production run for rest of day.
Содержание Omnivision 1000 Series
Страница 1: ...Omnivision Upgrade Installation Manual Document 45277 0805...
Страница 3: ...2 Document 45277 0805...
Страница 4: ...3 Omnivision Upgrade Installation Manual Document 45277 0805...
Страница 8: ...4 Omnivision Upgrade Installation Manual Document 00805...
Страница 15: ...Machine Preparation 7 Document 45277 0805 Echain...
Страница 17: ...Machine Preparation 9 Document 45277 0805 Red Harness Yellow Column White Column BLUE COLUMN Plate 2 Location...
Страница 62: ...54 Omnivision Upgrade Installation Manual Document 45277 0805 5 Measure XFMR2 P1 for 220VAC 6 Turn Off CB12...
Страница 70: ...62 Omnivision Upgrade Installation Manual Document 45277 0805...