background image

Installation and Operation Manual 

FVA-IP Camera

 

30 

P/N 06-523 (Rev. 6) 

Revision Date: June, 2019

 

4.0  Video Management System 

FVA‐IP  cameras  do  not  have  any  storage  capacity  on  board  to  capture  and  replay  video  images  of  alarm  conditions.  
This  must  be  done  through  use  of  a  video  management  system.    In  addition,  the  video  management  software  user 
Interface does not communicate directly to FVA‐IP cameras, but rather through the Fike Video Analytics system video 
management equipment, FSM‐IP NVR. 

If the Fike Video Analytics system will not be using the FSM‐IP hardware/software package, then an alternative third‐
party video management system must be used.  A Software Development Kit (SDK) is available that allows such third‐
party systems to use software modules to gain access to data from Fike Video Analytics FVA‐IP network cameras and to 
act as a conduit for control commands from the Fike Video Analytics video management software to the cameras.  If 
your  installation  will  be  using  a  third‐party  video  management  system,  contact  Fike  Video  Analytics  Corporation  for 
further information on the SDK. 

5.0  Fike Video Analytics Video Management Software 

Now  that  the  cameras  are  installed,  and  the  FSM‐IP  video  management  system  has  been  placed  on  the  local  area 
network (LAN), the video management software can be installed on an approved PC workstation.  The VMS software is 
used to create the organization structure, configure the camera settings and monitor the cameras.  The VMS software 
should be installed on at least one local workstation located on the same LAN as the cameras.  However, additional 
copies of the VMS software can be installed on other computers that have network access to the video management 
system being used.  See appendix C for VMS software system requirements.  For more detailed information on the Fike 
Video  Analytics  video  management  software  and  its  plethora  of  functions  please  see  the  Fike  Video  Analytics  video 
management software manual. 

6.0  Commissioning 

It takes approximately 30 days to properly install, commission, and fill out commissioning paperwork.  It is important to 
contact the local Authority Having Jurisdiction (AHJ) or the facility manager in charge of monitoring the fire protection 
system prior to application to ensure all required paper work has been completed.   

At a minimum, commissioning includes: 

 

Testing  and  stability  period  –  where  the  system  is  subjected  to  fire  and  nuisance  sources  to  demonstrate 
stability and performance. 

 

Documentation ‐ Documentation of the organizational structure, camera settings, sensitivity settings, zones, 
schedules and events archive.  (see Appendix D) 

 

Preliminary  Maintenance  and  service  check  ‐  The  system  should  be  checked  according  to  the  service  and 
maintenance requirements to establish the systems condition upon installation. 

Once  the  system  is  in  place  and  settings  adjusted  as  necessary  to  ensure  optimum  performance,  the  system  can  be 
handed over to the end user (on‐site security or a remote monitoring facility).  The system owner should record any 
changes up to one year after commissioning of the system. 

NOTE: 

 During the commissioning period the cache file and memory storage on the video management system should 

be regularly checked to ensure that adequate memory is available to store events for 30 days. 

Содержание FVA-IP

Страница 1: ...FIKEVIDEOANALYTICSCORPORATION Video Analytics Corporation Fike Video Analytics FVA IP Camera Installation and Operation Manual P N 06 523 Rev 6 06 19...

Страница 2: ...s manual without express written permission from Fike Video Analytics Corporation This manual contains proprietary information intended for distribution to authorized persons or companies for the sole...

Страница 3: ...ures 17 3 5 Administration Features 19 4 0 Video Management System 30 5 0 Fike Video Analytics Video Management Software 30 6 0 Commissioning 30 6 1 Inspection Testing and Maintenance Recommendations...

Страница 4: ...Installation and Operation Manual FVA IP Camera ii P N 06 523 Rev 6 Revision Date June 2019 This page intentionally left blank...

Страница 5: ...tallation should be done only by qualified service personnel and conform to local codes 10 Ensure that the camera is securely mounted Use installation methods and materials capable of supporting four...

Страница 6: ...hin the entire observed space of the CCTV camera This fundamental difference results in faster fire and smoke detection and most importantly provides a visual picture of the situation to responding pe...

Страница 7: ...you can use an approved workstation for video surveillance fire safety monitoring and to configure any number of cameras The software provides the tools to monitor your facilities build an organizati...

Страница 8: ...long as it is connected through a standard IP network connection Figure 2 is an example of the scalable enterprise architecture Fig 2 Typical installation of a Fike Video Analytics system with 8 FVA...

Страница 9: ...Ethernet POE or a 12 24 VDC 1A Class 2 power supply certified for use with security and or fire applications only Both can be used together for redundancy Electrical ratings can be found on the FVA I...

Страница 10: ...ce and the FOV covers both the floor and ceiling maximizing the area covered The camera was mounted 15 ft 4 6 m high with a 70 ft 21 m unobstructed view down the length of the warehouse 2 2 Field of V...

Страница 11: ...he fire size at detection The range of potential smoke sources and their corresponding optical densities makes it difficult to theoretically estimate the exact distance at which a threshold of smoke d...

Страница 12: ...measured at the floor level for the hazard area or the FM approved 4 8 Fc 48 lux at 30 inches 76 cm above the floor surface General lighting shall meet the minimum emergency lighting requirements of N...

Страница 13: ...to automatically switch between low voltage power supply and POE if one is to fail NOTE All wiring should be done according to NEC 70 practices 2 7 Network Configuration NOTE If your organization uses...

Страница 14: ...network hub or LAN connecting the monitoring workstation running the Fike Video Analytics video management software and the FSM IP NVR In addition dry contact connections are provided one each FVA IP...

Страница 15: ...regular system maintenance and any future incident investigation NOTE The Fike Video Analytics detection system shall comply with all applicable requirements of NFPA 72 including but not limited to ba...

Страница 16: ...BNC power in power out and audio connections Power with 12 24 VDC UL 12 VDC FM from UL listed Class 2 power supply for security or fire should be used POE may be used as supplemental to the listed 12...

Страница 17: ...n the IP camera To run the FVA IP camera interface and configure the camera a computer with either FireFox or Internet Explorer is required If Internet Explorer is used Java must be properly installed...

Страница 18: ...al tab 5 Select Use the following IP Address and enter the IP address in the correct range 192 168 0 1 to 192 168 0 256 subnet mask 255 255 255 0 6 Connect the computer to a HUB and the IP camera to t...

Страница 19: ...d 12 or 24 volt power supply Connect the Ethernet cable to a hub and attach the laptop or workstation used to configure the camera to the hub 3 3 IP Camera Communications Open the preferred internet b...

Страница 20: ...t fire alarm panel Both sections administrator and operator are secured from the other by a user name and password The factory default user name and password for each section is Operator section User...

Страница 21: ...ted and recorded and any dry contacts that are set to close on the event type would close This feature is good for testing the camera s functionality or recording events that are non detectable by the...

Страница 22: ...he Operations menu Relay Control identifies the state of the relay what event types are associated with a given relay and provides the operator the functionality to confirm delay or reset an event Fig...

Страница 23: ...rtified authority having sole control of the settings of the system has a number of features he she should be familiar with and will have to configure to fit the architecture and design of the system...

Страница 24: ...s the administrator to change the manufacturer pre set passwords for both the operator and administrator Fig 15 Access control with default password axonx The next sub menu item is the Date Time Figur...

Страница 25: ...ame Contact the IT personnel to assist in configuring the network setup After the network setup comes the camera setting which define the camera name flicker control frame time and video format NTSC o...

Страница 26: ...monitoring personnel to confirm delay or reset the event The delay time can be set from 0 to 250 seconds To initiate a relay select the desire event you wish the relay to activate on The selected eve...

Страница 27: ...th flame and smoke NOTE The Offsite algorithm is not an FM approved detection method The fire smoke and offsite reflected fire light algorithms can be set to low medium or high The smoke also has an u...

Страница 28: ...les The Restart Camera button Figure 21 reboots the camera You will be asked if you are sure you wish to restart the camera to avoid an accidental restart Whenever changes are made to the camera setti...

Страница 29: ...ory Defaults The Reset Camera button Figure 22 reboots the camera and sets the configuration to the default settings however it does not change the network settings Fig 22 Camera restore The Restore F...

Страница 30: ...FVA IP Camera 26 P N 06 523 Rev 6 Revision Date June 2019 The Upgrade Firmware feature allows the end user to upgrade the software on the FVA IP camera when it is suggested by the manufacturer Figure...

Страница 31: ...the Schedules window pane Figure 25 You will then be asked to set the schedule by first providing a name then defining the time period Figure 26 The name should reflect the schedule type so it is int...

Страница 32: ...software be used to set all schedules and zones once the system is in place and being commissioned The zone name should be descriptive in nature and describe the purpose of the zone The user must defi...

Страница 33: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 29 Fig 28 Create a zone by providing a zone name type action and zone size defined by points...

Страница 34: ...ed on the same LAN as the cameras However additional copies of the VMS software can be installed on other computers that have network access to the video management system being used See appendix C fo...

Страница 35: ...station Fike VMS software can be checked for clarity to ensure that a buildup of dust grease or other debris has not obscured the lens Reference images produced from the Fike VMS software report see...

Страница 36: ...o images acquired by the CMOS sensor One can divide this process into 2 stages The first stage is formation of the image and acquisition into the digital form The second stage is the processing of the...

Страница 37: ...larm response will propagate to the user interface On completion of this test the user alarm can be stopped and the relay can be disengaged This scenario ensures that communications are functioning an...

Страница 38: ...the camera or the camera has become misaligned and is facing a wall or other large object If possible remove the obstruction and take preventative measure to ensure that it does not occur again or and...

Страница 39: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 35 Appendix A FVA IP Camera Specifications...

Страница 40: ...Installation and Operation Manual FVA IP Camera 36 P N 06 523 Rev 6 Revision Date June 2019...

Страница 41: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 37...

Страница 42: ...Installation and Operation Manual FVA IP Camera 38 P N 06 523 Rev 6 Revision Date June 2019...

Страница 43: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 39 Appendix B Dry Contact Diagram...

Страница 44: ...Installation and Operation Manual FVA IP Camera 40 P N 06 523 Rev 6 Revision Date June 2019 V in Relay 1 Relay 2 Relay 3 V out NO C NC NC C NO NO C NC 1 2 3 4 5 6 7 8 9 10 11 12 13...

Страница 45: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 41 Appendix C Fike Video Analytics System FM approved Computer Requirements...

Страница 46: ...vision Date June 2019 Minimum requirements Pentium III 600 MHZ 128MB RAM 10GB HDD 800x600 pixel screen resolution true color video adapter Windows 2000 Microsoft Speech Microsoft NET runtime v 1 5 Rec...

Страница 47: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 43 Appendix D Commissioning Paper Work...

Страница 48: ...Installation and Operation Manual FVA IP Camera 44 P N 06 523 Rev 6 Revision Date June 2019...

Страница 49: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 45...

Страница 50: ...Installation and Operation Manual FVA IP Camera 46 P N 06 523 Rev 6 Revision Date June 2019...

Страница 51: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 47...

Страница 52: ...Installation and Operation Manual FVA IP Camera 48 P N 06 523 Rev 6 Revision Date June 2019...

Страница 53: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 49 Appendix E Approved Fire Test Results...

Страница 54: ...00 ft 16 9 9 10 1 ft pan of Unleaded Gasoline 100 ft 8 8 8 9 4 min Smoke Emitter 100 ft 301 94 52 63 4 min Smoke emitter 75 ft 43 24 22 48 6 in pan of Heptane 100 ft 100 10 9 10 Cardboard boxes and pa...

Страница 55: ...to Fike Video Analytics Corporation 5 03 19 Revised document to replace SigniFire references with Fike Video Analytics Replaced all Fike Video Analytics IP references with FVA IP 6 06 19 Revised docum...