Installation and Operation Manual
FVA-IP Camera
24
P/N 06-523 (Rev. 6)
Revision Date: June, 2019
The
Camera
Report
feature, Figure 20, is a useful tool to installers, AHJ’s, and for maintenance purposes. The button
provides all the selected variables in a format that can be saved to a text file and printed out for record keeping.
Fig 20 – Camera report provides a list of the configured variables.
The
Restart
Camera
button, Figure 21, reboots the camera. You will be asked if you are sure you wish to restart the
camera to avoid an accidental restart. Whenever changes are made to the camera setting within the camera interface
it is good practice to save and restart the camera.
NOTE:
If you restart the camera after changing communications settings, you will lose communication with the camera
until you enter the same settings on the computer. Powering down the camera also performs a restart. It is
recommended that the restart function be used with caution.
Fig 21 – Camera restart
Содержание FVA-IP
Страница 40: ...Installation and Operation Manual FVA IP Camera 36 P N 06 523 Rev 6 Revision Date June 2019...
Страница 41: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 37...
Страница 42: ...Installation and Operation Manual FVA IP Camera 38 P N 06 523 Rev 6 Revision Date June 2019...
Страница 48: ...Installation and Operation Manual FVA IP Camera 44 P N 06 523 Rev 6 Revision Date June 2019...
Страница 49: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 45...
Страница 50: ...Installation and Operation Manual FVA IP Camera 46 P N 06 523 Rev 6 Revision Date June 2019...
Страница 51: ...FVA IP Camera Installation and Operation Manual Revision Date June 2019 P N 06 523 Rev 5 47...
Страница 52: ...Installation and Operation Manual FVA IP Camera 48 P N 06 523 Rev 6 Revision Date June 2019...