Fetco CBS-5000H Series Скачать руководство пользователя страница 8

Go to fetco.com for the latest versions of all information        

 

Page 8                 

P183   March 2019

 

 

 

 

CAUTION 

 

Do not remove the brew basket immediately after the brew cycle has finished.  Wait until 

dripping from the bottom of the brew basket has stopped.  Carefully remove the brew basket 

while inspecting the inside of the basket for hot coffee that may have been trapped or has not 

finished draining. 

 

 

Service 

Warranty 

 

All FETCO brewers come with a limited warranty.  All warranty service must be pre-authorized by calling the 

FETCO Service Department at (800) 338-2699. 

 

Principles of Operation

 

 

Fill System 

 

The fill system consists of a liquid level control board, a water level probe at the top of the tank, a fill valve, and a fill 

tube.  As the water rises and touches the probe, continuity is established between the probe tip and the tank body, 

and the fill valve closes. 

 

When water is dispensed, the water level drops below the probe.  After a 5 second delay, the fill valve opens until 

the water touches the probe again. 

 

The 5 second delay, and the speed that water refills the tank during brewing, results in many short bursts of water.  

The sound made by these repetitive bursts will let you know the fill system is functioning normally. 

 

The fill system is designed to protect the heaters during both the installation and a loss of the water supply.  During 

initial installation, or whenever the power switch is turned on, voltage will not be supplied to the thermostat until the 

tank fills and water touches the water level probe. 

During operation, when water is dispensed and the water level drops below the probe, a fill signal is sent to the fill 

valve.  If the probe senses no water after 40 seconds, the voltage to the thermostat and the heaters is removed. 

 

Water enters the tank through the fill tube.  A hole is drilled in the upper portion of the fill tube to prevent water from 

being siphoned from the tank.  The fill tube extends to the bottom area of the tank.  This introduces cold incoming 

water directly to the heaters and away from the dispense assembly. 

 

The water tank can be drained through a valve located inside the lower compartment of the brewer. 

 

Temperature System: 

 

The temperature system consists of an electronic thermostat, a temperature probe, solid state relays (SSR), and 

heating elements, and is enabled by the liquid level control board.  (See the previous section - Fill Circuit.) 

 

When the water level probe is in contact with water, power is delivered to the thermostat through the liquid level 

control board.  If the temperature probe senses that the water is not hot enough, the thermostat energizes the 

heating elements through the solid state relay (SSR), the water is heated, and the ready light goes off. 

 

Once the water temperature reaches the set point, the thermostat disengages power to the heaters and the ready 

light illuminates. 

 

The thermostat is adjusted to 205

°

 F 

±

 2

°

 at the factory. (Slightly lower for high altitude installations.) 

 

Содержание CBS-5000H Series

Страница 1: ...ingle1 Gal CBS 51H15 Right Dual 2 Gal CBS 52H20 Contact Information FETCO Food Equipment Technologies Company 600 Rose Road Lake Zurich IL 60047 1560 USA 2008 2019 Food Equipment Technologies Company...

Страница 2: ...lf batch brewing capability Fully automatic with electronic temperature control Iced tea brewing capability Two level tank drain system Total serviceability from the front Can be added at any time Spe...

Страница 3: ...ph 3 ground 6 1 25 8 9 9 22 0 120 208 1 ph 3 ground 6 1 29 6 9 9 22 0 C52026 2 X 4000 watt 120 220 1 ph 3 ground 6 8 31 3 11 5 22 0 120 240 1 ph 3 ground 8 1 34 1 13 2 22 0 120 208 3 ph 4 ground 6 9...

Страница 4: ...Go to fetco com for the latest versions of all information Page 4 P183 March 2019 Dimensions Utility Connections CBS 51H15 CBS 52H15 CBS 52H20...

Страница 5: ...ing Verify that the brewer will fit in the space intended for it and that the counter or table will support the total weight of the brewer and dispensers when filled 2 The brewer s legs are shipped in...

Страница 6: ...tubes 2 Turn on the incoming power 3 Turn on the brewer s main power switch 4 Within 6 seconds the hot water tank will begin filling until the probe at the top of the tank senses the water 5 The contr...

Страница 7: ...ion This was done to help draw attention to the basket so the operator will notice any residual hot water or coffee Place a paper filter in each basket to be used Pour into the paper filter the approp...

Страница 8: ...never the power switch is turned on voltage will not be supplied to the thermostat until the tank fills and water touches the water level probe During operation when water is dispensed and the water l...

Страница 9: ...cutter controls the rate of flow over the coffee The standard hole in the flow disc is 240 except for the CBS 51H10 which is 219 Other flow discs are available for special situations like high levels...

Страница 10: ...ISPENSE TUBE SHAFT DISPENSE TUBE To remove the dispense tube 1 Unscrew seal locknut and release the drive screw from dispense tube shaft 2 Turn the dispense tube slightly back and forth while pushing...

Страница 11: ...will flash indicating that the display is showing the set point not the actual temperature The dots below the numbers indicate the temp range 0 dots less than 100 F 1 dot between 100 and 200 F 2 dots...

Страница 12: ...is energized Bypass Adjustment The purpose of the bypass valve is to allow a portion of the brewing water to flow between the brew basket and the wire insert directly into the server without coming in...

Страница 13: ...NUT SEAL 7 16 DIA KEEPER 17 2 1031 00033 00 LOCKNUT 3 8 18 NPT THREAD 18 1 1031 00022 00 FITTING ELBOW 3 8 TUBE OD X 3 8 NPT 19 1 1023 00003 00 LOCKNUT MODIFIED THREAD 1 4 18 NPT 20 1 1083 00006 00 WA...

Страница 14: ...Go to fetco com for the latest versions of all information Page 14 P183 March 2019 Figure 2 CBS 51H15 Main Assembly Drawing No 1101 00268 00 CBS 51 H...

Страница 15: ...AMP READY INDICATOR GREEN 220VAC EXPORT ONLY 26 1 1045 00022 00 OVERLAY CONTROL PANEL CBS 51H 27 1 1058 00011 00 LAMP BREW INDICATOR CLEAR 110VAC 27 1 58004 LAMP BREW INDICATOR CLEAR 220VAC EXPORT ONL...

Страница 16: ...Go to fetco com for the latest versions of all information Page 16 P183 March 2019 Figure 3 CBS 52H15 CBS 52H20 Main Assembly Drawing No 1101 00262 00 CBS 52H...

Страница 17: ...SPRAY CUTTER 8 1 075 CENTER 29 2 1012 00004 00 LOCKNUT SPRAY CUTTER 30 2 25001 TUBESILICONE 1 2 x 1 4 ID x 2 7 8 LG 31 2 1112 00041 00 DISPENSE TUBE WELDMENT CBS 50 S 32 1 102010 BREW HANDLE START STO...

Страница 18: ...00024 00 FITTING COMP MALE CONN 3 8 TUBE X 3 8 17 1 1031 00020 00 LOCKNUT 1 8 STRAIGHT PIPE THREAD 18 1 1083 00014 00 WASHER 812 OD X 0 412 ID FLAT 19 1 1031 00032 00 FITTING BARB ELBOW 90 1 4 HOSE ID...

Страница 19: ...BREW BASKET HANDLE BLACK includes magnet 3 1 1082 00040 00 HANDLE SCREW 4 1 1009 00005 00 WIRE INSERT 16 X 6 5 1 1046 00025 00 WARNING LABEL NOT SHOWN F001 PAPER FILTERS 15 X 5 5 500 PER CASE NOT SHO...

Страница 20: ...evels are erratic Water pressure or flow rate is too low or fluctuates too much to support a full brew problem is worse in simultaneous brews Make sure brewer has a dedicated water line Ensure that th...

Страница 21: ...isconnect the outlet side to see if it leaks water to the tank Coffee tastes too strong Incorrect dosage Measure and confirm the correct amount of coffee required Short brew levels See Short brew leve...

Страница 22: ...End of section notes N...

Отзывы: