Fetco CBS-5000H Series Скачать руководство пользователя страница 6

Go to fetco.com for the latest versions of all information        

 

Page 6                 

P183   March 2019

 

 

 

 

Electrical Connection 

1.  Verify that the actual voltage at the electrical service connection is compatible with the specifications on the 

brewer’s serial number label.  Make sure the electrical service includes 

neutral

2.  The temperature and water tank fill level are pre-set at the factory.  There is no need to turn off the heaters 

during the installation process.  The control board disables the heaters until the tank is full of water.  The 

heating process will start automatically when the tank has filled. 

3.  Only 120VAC powered units are shipped from the factory with power cords and plugs attached.  For other 

voltages, a terminal block is provided for connecting the incoming power wires.  Consult local codes to 

determine if a cord and plug can be installed, or if the unit must be hard wired. 

4.  A fused disconnect switch or circuit breaker on the incoming power line must be conveniently located near the 

brewer, and its location and markings known to the operators. 

5.  The body of the brewer must be grounded to a suitable building ground.  

A ground lug is provided in the brewer next to the power terminal 

block.  Use only 10 gauge copper wire for grounding. 

6.  Electrical connections must be secured in-place within the unit to meet 

national and local standards. 

 

L1

L2

N

GROUND LUG

GROUND

WIRE

SINGLE PHASE

TERMINAL BLOCK

N

208-240V

120V

120V

 

3 PHASE

TERMINAL BLOCK

GROUND LUG

GROUND

WIRE

L1 L2 L3

N

N

120V

208-240V

208-240V

208-240V

 

Electrical Configurations – US & Canada 

 

7.  Finally, connect the incoming power wires to the terminal block in accordance with applicable codes. 

 

Final Setup 

1.  Turn on the incoming water supply line and inspect both inside and outside of the brewer for leaks in all fittings 

and tubes 

2.  Turn on the incoming power. 

3.  Turn on the brewer’s main power switch. 

4.  Within 6 seconds, the hot water tank will begin filling until the probe at the top of the tank senses the water. 

5.  The control board will disable the heaters until the tank is full. 

6.  The brewer will be ready for operation as soon as the ready light comes on to signify that the water tank is up to 

temperature. The time required to reach brewing temperature will vary according to the electrical configuration 

ordered. 

7.  Review the Operating Instructions. Brew one full batch (water only) on each side to confirm proper fill levels. 

The brewer is factory set with water only (no coffee) to dispense the correct amount of water. 

8.  Re-attach the covers after one final inspection for leaks.  Look closely in the top of the brewer at the dispense 

fittings during this inspection. 

 

Operator Training 

Review the operating procedures with whoever will be using the brewer.  Pay particular attention to the following 

areas: 

 

1.  Always pre-heat the dispensers before the first use of each day by filling them half way with hot water, and 

letting them stand for at least 15 minutes. 

2.  Don't remove the brew basket until it has stopped dripping.  

3.  Make sure the dispenser is empty before brewing into it. 

4.  Show how to attach covers, close, and or secure the thermal dispensers for transporting. 

5.  Show the location and operation of the water shut off valve as well as the circuit breaker for the brewer. 

6.  Steam from the tank will form condensation in the vent tubes.  This condensation will drip into and then out of 

the brew baskets.  1/4 cup discharging overnight is possible.  Place an appropriate container under each brew 

basket when not in use. 

7.  We recommend leaving the power to the brewer on overnight. The water tank is well insulated and will use very 

little electricity to keep the tank hot.  Leaving the brewer in the on position will also avoid delays at the 

beginning of shifts for the brewer to reach operating temperature. 

Содержание CBS-5000H Series

Страница 1: ...ingle1 Gal CBS 51H15 Right Dual 2 Gal CBS 52H20 Contact Information FETCO Food Equipment Technologies Company 600 Rose Road Lake Zurich IL 60047 1560 USA 2008 2019 Food Equipment Technologies Company...

Страница 2: ...lf batch brewing capability Fully automatic with electronic temperature control Iced tea brewing capability Two level tank drain system Total serviceability from the front Can be added at any time Spe...

Страница 3: ...ph 3 ground 6 1 25 8 9 9 22 0 120 208 1 ph 3 ground 6 1 29 6 9 9 22 0 C52026 2 X 4000 watt 120 220 1 ph 3 ground 6 8 31 3 11 5 22 0 120 240 1 ph 3 ground 8 1 34 1 13 2 22 0 120 208 3 ph 4 ground 6 9...

Страница 4: ...Go to fetco com for the latest versions of all information Page 4 P183 March 2019 Dimensions Utility Connections CBS 51H15 CBS 52H15 CBS 52H20...

Страница 5: ...ing Verify that the brewer will fit in the space intended for it and that the counter or table will support the total weight of the brewer and dispensers when filled 2 The brewer s legs are shipped in...

Страница 6: ...tubes 2 Turn on the incoming power 3 Turn on the brewer s main power switch 4 Within 6 seconds the hot water tank will begin filling until the probe at the top of the tank senses the water 5 The contr...

Страница 7: ...ion This was done to help draw attention to the basket so the operator will notice any residual hot water or coffee Place a paper filter in each basket to be used Pour into the paper filter the approp...

Страница 8: ...never the power switch is turned on voltage will not be supplied to the thermostat until the tank fills and water touches the water level probe During operation when water is dispensed and the water l...

Страница 9: ...cutter controls the rate of flow over the coffee The standard hole in the flow disc is 240 except for the CBS 51H10 which is 219 Other flow discs are available for special situations like high levels...

Страница 10: ...ISPENSE TUBE SHAFT DISPENSE TUBE To remove the dispense tube 1 Unscrew seal locknut and release the drive screw from dispense tube shaft 2 Turn the dispense tube slightly back and forth while pushing...

Страница 11: ...will flash indicating that the display is showing the set point not the actual temperature The dots below the numbers indicate the temp range 0 dots less than 100 F 1 dot between 100 and 200 F 2 dots...

Страница 12: ...is energized Bypass Adjustment The purpose of the bypass valve is to allow a portion of the brewing water to flow between the brew basket and the wire insert directly into the server without coming in...

Страница 13: ...NUT SEAL 7 16 DIA KEEPER 17 2 1031 00033 00 LOCKNUT 3 8 18 NPT THREAD 18 1 1031 00022 00 FITTING ELBOW 3 8 TUBE OD X 3 8 NPT 19 1 1023 00003 00 LOCKNUT MODIFIED THREAD 1 4 18 NPT 20 1 1083 00006 00 WA...

Страница 14: ...Go to fetco com for the latest versions of all information Page 14 P183 March 2019 Figure 2 CBS 51H15 Main Assembly Drawing No 1101 00268 00 CBS 51 H...

Страница 15: ...AMP READY INDICATOR GREEN 220VAC EXPORT ONLY 26 1 1045 00022 00 OVERLAY CONTROL PANEL CBS 51H 27 1 1058 00011 00 LAMP BREW INDICATOR CLEAR 110VAC 27 1 58004 LAMP BREW INDICATOR CLEAR 220VAC EXPORT ONL...

Страница 16: ...Go to fetco com for the latest versions of all information Page 16 P183 March 2019 Figure 3 CBS 52H15 CBS 52H20 Main Assembly Drawing No 1101 00262 00 CBS 52H...

Страница 17: ...SPRAY CUTTER 8 1 075 CENTER 29 2 1012 00004 00 LOCKNUT SPRAY CUTTER 30 2 25001 TUBESILICONE 1 2 x 1 4 ID x 2 7 8 LG 31 2 1112 00041 00 DISPENSE TUBE WELDMENT CBS 50 S 32 1 102010 BREW HANDLE START STO...

Страница 18: ...00024 00 FITTING COMP MALE CONN 3 8 TUBE X 3 8 17 1 1031 00020 00 LOCKNUT 1 8 STRAIGHT PIPE THREAD 18 1 1083 00014 00 WASHER 812 OD X 0 412 ID FLAT 19 1 1031 00032 00 FITTING BARB ELBOW 90 1 4 HOSE ID...

Страница 19: ...BREW BASKET HANDLE BLACK includes magnet 3 1 1082 00040 00 HANDLE SCREW 4 1 1009 00005 00 WIRE INSERT 16 X 6 5 1 1046 00025 00 WARNING LABEL NOT SHOWN F001 PAPER FILTERS 15 X 5 5 500 PER CASE NOT SHO...

Страница 20: ...evels are erratic Water pressure or flow rate is too low or fluctuates too much to support a full brew problem is worse in simultaneous brews Make sure brewer has a dedicated water line Ensure that th...

Страница 21: ...isconnect the outlet side to see if it leaks water to the tank Coffee tastes too strong Incorrect dosage Measure and confirm the correct amount of coffee required Short brew levels See Short brew leve...

Страница 22: ...End of section notes N...

Отзывы: