
5. Maintenance and conversion
5−7
Festo P.BE−CPVSC−E N en 0301a
3
1
2
1
Components to be replaced
2
Tie rod screws unscrewed up to 9 mm
3
2 mm gap to the left and right of the
component to be replaced
Fig.5/1:
Loosening the tie rods
3. Removing the double−solenoid valve Ident. code J":
Both valve plates, control" and work valve" must be
removed.
4. Pull the component forwards so that it can be discon
nected from the plug of the electric circuit. Then lift it up
slightly and pull it forwards away from the tie rod.
Содержание Smart cubic CPVSC1-VI
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0301a...
Страница 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0301a...
Страница 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0301a Chapter 1...
Страница 22: ...1 Summary of components 1 10 Festo P BE CPVSC EN en 0301a...
Страница 23: ...Fitting 2 1 Festo P BE CPVSC EN en 0301a Chapter 2...
Страница 31: ...Installation 3 1 Festo P BE CPVSC EN en 0301a Chapter 3...
Страница 50: ...3 Installation 3 20 Festo P BE CPVSC EN en 0301a...
Страница 51: ...Commissioning 4 1 Festo P BE CPVSC EN en 0301a Chapter 4...
Страница 66: ...4 Commissioning 4 16 Festo P BE CPVSC EN en 0301a...
Страница 67: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0301a Chapter 5...
Страница 77: ...Technical appendix A 1 Festo P BE CPVSC EN en 0301a Appendix A...
Страница 87: ...Index B 1 Festo P BE CPVSC EN en 0301a Appendix B...
Страница 88: ...B Index B 2 Festo P BE CPVSC EN en 0301a Contents B Index B 1 B 1 Index B 3...