3. Installation
3−19
Festo P.BE−CPVSC−E N en 0301a
Detailed information on fitting the electrical connections can
be found in the leaflet supplied with the product.
3.4
Address assignment of the valves
CPV−SC valve terminal with MP connection
The addresses must be assigned in ascending order with
out gaps.
Counting begins on the valve terminal from left to right
(see diagram).
A valve location always occupies one address:
0
1
2
3
4
5
6
7
8
9
10
11
1
2
3
3
2
1
Address of valve solenoid coil/valve
location number
2
A double−solenoid valve occupies two
valve locations
3
A single−solenoid valve occupies one
valve location
Fig.3/6:
Example: Address assignment of a CPV−SC valve terminal with 12valve
locations (front view)
Содержание Smart cubic CPVSC1-VI
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0301a...
Страница 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0301a...
Страница 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0301a Chapter 1...
Страница 22: ...1 Summary of components 1 10 Festo P BE CPVSC EN en 0301a...
Страница 23: ...Fitting 2 1 Festo P BE CPVSC EN en 0301a Chapter 2...
Страница 31: ...Installation 3 1 Festo P BE CPVSC EN en 0301a Chapter 3...
Страница 50: ...3 Installation 3 20 Festo P BE CPVSC EN en 0301a...
Страница 51: ...Commissioning 4 1 Festo P BE CPVSC EN en 0301a Chapter 4...
Страница 66: ...4 Commissioning 4 16 Festo P BE CPVSC EN en 0301a...
Страница 67: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0301a Chapter 5...
Страница 77: ...Technical appendix A 1 Festo P BE CPVSC EN en 0301a Appendix A...
Страница 87: ...Index B 1 Festo P BE CPVSC EN en 0301a Appendix B...
Страница 88: ...B Index B 2 Festo P BE CPVSC EN en 0301a Contents B Index B 1 B 1 Index B 3...