2.2.3 Commissioning the CP system on the PROFIBUS-DP
PLEASE NOTE
The switching-on instructions in the manual for your
controller must also be observed.
Proceed as follows:
1. Connect the fieldbus cable to the fieldbus node.
2. Switch on the operating voltages:
••
for all fieldbus slaves,
••
for the CP system.
3. Switch on the operating voltage for the master
module.
When switched on, some master systems will automat-
ically carry out a comparison between the NOMINAL
and ACTUAL configurations. For this configuration run it
is important that:
Configura-
tion run
– the specifications on the NOMINAL configuration are
complete and correct (see also section 2.1.2).
– the power supplies to the PLC and to the fieldbus
slaves are switched on either simultaneously or in
the sequence specified above.
2. Commissioning
2-30
CP FB13-E 9904b
Содержание Compact Performance CP-FB9-E
Страница 12: ...Chapter 1 Installation 1 Installation CP FB13 E 9904b 1 1 ...
Страница 16: ...1 2 DIL switch Cover screws Fig 1 1 Position of the DIL switch 2 1 1 Installation CP FB13 E 9904b 1 5 ...
Страница 30: ...Chapter 2 Commissioning 2 Commissioning CP FB13 E 9904b 2 1 ...
Страница 70: ...Chapter 3 Diagnosis 3 Diagnosis CP FB13 E 9904b 3 1 ...
Страница 95: ...3 Diagnosis 3 26 CP FB13 E 9904b ...
Страница 96: ...Appendix A Technical specifications A Technical specifications and index CP FB13 E 9904b A 1 ...